Mechanical Installation, continued

 

 
The  bracket  is  designed  to  be  bent  for  universal  installation  option.  This  bracket  allows  for  various 
mounting options. Mark the drill holes for the self-tapping screws to mount the FC- 400 to the Duct Wall 
 
Affix the unit securely in the duct using self-tapping screws. Do not over-tighten, this may strip the screw-
hole. The unit is self-sealing to the duct so no further sealing is needed. (FC- 400 FM) 
 

For  in-plenum/AHU  installation

:  Mounting  varies  with  bracket-style.  Follow  mounting  instructions.   

Typically, provide 50.8mm tube of clearance from walls. 
 
Units should be installed to allow easy access for maintenance. Install units so that the power adjustment 
knob, fuse and status light are easily accessible, variable and visible

 

Electrical Installation

 

 
AtmosAir  FC400  series  systems  require  approximately  7.68  watts. The  FC-400  series  can  be  wired 
directly to blower circuits. 
Follow proper electrical procedures, guidelines, and codes for providing power to the systems, including 
requirements  for  conduit,  sufficient  ampacity,  phase  balancing,  etc.  Electrical  installation  should  be 
performed by a qualified electrician. 
Field-install a power plug outlet or junction box within 1.82m of the unit(s). 
Each FC-400 series unit is typically shipped with a 2.438m power cord with a field install pair of wire 
hot/neutral  connector  on  one  end  and  a  quick  disconnect  plug  on  the  other  end.  FC-400FM  has  a 
moisture-proof quick disconnect on the unit. 
 
 
 
 

!!!WARNING!!! 
The secondary voltage to the ionization tube can be as high as 2000 volts AC. Do NOT connect to power 
before the installation is complete and all personnel are aware of imminent operation. Always disconnect 
power to the unit before handling any of the components. 
!!!WARNING!!! 
 

 

Содержание FC-400 Series

Страница 1: ...Installation Operations and Maintenance Guide AtmosAir FC 400 FC 400 FM...

Страница 2: ...ated The number and size of the ionization units used is dependent upon the airflow size of the space and severity of the pollution and odors The AtmosAir FC 400 series equipment is designed for minim...

Страница 3: ...AC 50 60Hz Install the ionization tube Gently pull the conductor strap back to allow the tube to turn freely screw the end screw of the tube into the tube holder hand tight Ensure that the tube is ful...

Страница 4: ...nstallation AtmosAir FC400 series systems require approximately 7 68 watts The FC 400 series can be wired directly to blower circuits Follow proper electrical procedures guidelines and codes for provi...

Страница 5: ...he desired ion increase and appropriate system layout CAUTION A non functioning LED light may improperly indicate that the system is not functioning Be sure to disconnect quick disconnect power before...

Страница 6: ...ing 2 Year Tube Replacements The ionization tubes should be replaced once every 24 months at a minimum as the production efficiency slowly declines over time due to the stress caused by plasma and lac...

Страница 7: ...h tube for cracks pitting or other degeneration of the dielectric material that causes the dielectric to fail and arcing to occur 5 If physical inspection has not revealed the cause of failure one may...

Страница 8: ...essor It may be useful to remove the tubes for improved cleaning Cleaning the general area around the tubes to remove dust dirt and debris will keep the tubes clean longer CAUTION Do not immerse the t...

Страница 9: ...ency and life of the tube The silicone seal between the tube and the cap keeps moisture from infiltrating the tube Excessive aluminum oxide build up on the inner electrode can decrease the strength of...

Отзывы: