Installation 

 
AtmosAir FC-400 series equipment can be mounted in a duct (FC-400 FM) or, air handler  wall or in 
supply slot FC-400, using the faceplate mounting flange and its weather-strip gasket; or inside a plenum 
using a universal mounting bracket.    The units operate best when located after all filters, coils, and fans. 
Various mounting arrangements are possible; however, the available options may be limited due to size 
and configuration restrictions. 
When mounted on the side of a duct or air handler wall, the enclosure should not be exposed to direct 
sunlight or moisture. If installing outside, a weatherproof enclosure with an access panel for servicing 
should be installed over the AtmosAir equipment. 
The AtmosAir  FC-400  series  operates  on  110~250  VAC,  50/60  Hz. The  tube  and  electrode  contacts 
should not come into contact with any conductive surface. A minimum  63.5mm clearance around the 
tube is recommended. 
 

Mechanical Installation

 

 
Carefully remove the equipment from its shipping container. Inspect the main components, gasket, and 
tube for damage. Verify that the unit’s voltage rating is the same as the available voltage, 110~250 VAC 
50/60Hz. 
 
Install the ionization tube: Gently pull the conductor strap back to allow the tube to turn freely; screw the 
end screw of the tube into the tube- holder hand-tight. Ensure that the tube is fully seated. Do not over- 
tighten the tube! Once the tube is secure, return the conductor strap to its normal position and ensure 
solid and continuous contact is made with the tube’s outer mesh. The FC-400 series comes with a MCC 
B tube installed. 
 

Location and Orientation

: Install the unit downstream of filters, coils, and fans with tubes perpendicular 

to airflow  whenever possible. If multiple units are installed in the same duct,  stagger the units in the 
airflow so they are not in the same airflow path. 
 

For in-duct installation

: Verify the flange gasket (FC-400FM) is in place and in good shape to ensure 

the unit seals properly. Make a 63.5mm Diameter hole in the duct sized at for FC- 400FM use template 
provided  to  locate  and  cut  the  cut-out  hole,  then  cut  out  and  with  63.5mm  Hole  Saw  and  mark  the 
locations of the mounting holes for the FC-400 and FC- 400FM. The universal bracket is intended for 
duct installations where extra support of the unit is required. It may also be used for sheet-metal ducting. 
The  optional  universal  stainless  steel  bracket  is meant  to  be  installed  on  the  inside  of  the  duct,  in  a 
position allowing tool access. 
 

 

Содержание FC-400 Series

Страница 1: ...Installation Operations and Maintenance Guide AtmosAir FC 400 FC 400 FM...

Страница 2: ...ated The number and size of the ionization units used is dependent upon the airflow size of the space and severity of the pollution and odors The AtmosAir FC 400 series equipment is designed for minim...

Страница 3: ...AC 50 60Hz Install the ionization tube Gently pull the conductor strap back to allow the tube to turn freely screw the end screw of the tube into the tube holder hand tight Ensure that the tube is ful...

Страница 4: ...nstallation AtmosAir FC400 series systems require approximately 7 68 watts The FC 400 series can be wired directly to blower circuits Follow proper electrical procedures guidelines and codes for provi...

Страница 5: ...he desired ion increase and appropriate system layout CAUTION A non functioning LED light may improperly indicate that the system is not functioning Be sure to disconnect quick disconnect power before...

Страница 6: ...ing 2 Year Tube Replacements The ionization tubes should be replaced once every 24 months at a minimum as the production efficiency slowly declines over time due to the stress caused by plasma and lac...

Страница 7: ...h tube for cracks pitting or other degeneration of the dielectric material that causes the dielectric to fail and arcing to occur 5 If physical inspection has not revealed the cause of failure one may...

Страница 8: ...essor It may be useful to remove the tubes for improved cleaning Cleaning the general area around the tubes to remove dust dirt and debris will keep the tubes clean longer CAUTION Do not immerse the t...

Страница 9: ...ency and life of the tube The silicone seal between the tube and the cap keeps moisture from infiltrating the tube Excessive aluminum oxide build up on the inner electrode can decrease the strength of...