background image

 

 
 

Installation, Operations and 

Maintenance Guide 

AtmosAir 

FC-400 & FC-400 FM

 

 

 

 

Содержание FC-400 Series

Страница 1: ...Installation Operations and Maintenance Guide AtmosAir FC 400 FC 400 FM...

Страница 2: ...ated The number and size of the ionization units used is dependent upon the airflow size of the space and severity of the pollution and odors The AtmosAir FC 400 series equipment is designed for minim...

Страница 3: ...AC 50 60Hz Install the ionization tube Gently pull the conductor strap back to allow the tube to turn freely screw the end screw of the tube into the tube holder hand tight Ensure that the tube is ful...

Страница 4: ...nstallation AtmosAir FC400 series systems require approximately 7 68 watts The FC 400 series can be wired directly to blower circuits Follow proper electrical procedures guidelines and codes for provi...

Страница 5: ...he desired ion increase and appropriate system layout CAUTION A non functioning LED light may improperly indicate that the system is not functioning Be sure to disconnect quick disconnect power before...

Страница 6: ...ing 2 Year Tube Replacements The ionization tubes should be replaced once every 24 months at a minimum as the production efficiency slowly declines over time due to the stress caused by plasma and lac...

Страница 7: ...h tube for cracks pitting or other degeneration of the dielectric material that causes the dielectric to fail and arcing to occur 5 If physical inspection has not revealed the cause of failure one may...

Страница 8: ...essor It may be useful to remove the tubes for improved cleaning Cleaning the general area around the tubes to remove dust dirt and debris will keep the tubes clean longer CAUTION Do not immerse the t...

Страница 9: ...ency and life of the tube The silicone seal between the tube and the cap keeps moisture from infiltrating the tube Excessive aluminum oxide build up on the inner electrode can decrease the strength of...

Отзывы: