Maintenance
49
Apex-10 / Apex-10H
9.2 Periodic
Maintenance
Daily pre-operation
• Check hydraulic connections and hoses for leaks;
• Check safety lock audibly and visually while in operation;
• Check arm locks;
• Check bolts, nuts and screws are tight.
Every 1 month
• Check all cable connections, pins and bolts to insure proper mounting;
• Inspect all anchor bolts and retighten if necessary;
• Check columns for square and plumb;
• Check equalizer cable tension, adjust if necessary;
• Check safety cable, adjust it if necessary;
• Check all arm pivot pins. Make sure they are properly secured;
• Check all lifting pads, replace if necessary;
• Lubricant columns with grease;
• Check the hydraulic oil, fi ll or replace if necessary;
• Check hydraulic systems for proper operation.
Every 12 months
• Verify that all components and mechanisms are not damaged;
• Verify the equalizer cables are not worn up to 5%, change if necessary;
• Verify the safety cable is not worn, change if necessary;
• Check the electrical system to verify that the motor and overhead limit
switch operate properly (this work must be carried out by certifi ed
electricians);
• Empty the oil tank and change the hydraulic oil.
Содержание APEX-10
Страница 1: ......
Страница 19: ...Technical Specification 19 Apex 10 Apex 10H Figure 3a Standard Version...
Страница 20: ...Technical Specification 20 Apex 10 Apex 10H Figure 3b Taller Version...
Страница 23: ...Technical Specification 23 Apex 10 Apex 10H Figure 6 Electrical Diagram 220V 60Hz 1PH...
Страница 26: ...Safety 26 Apex 10 Apex 10H...
Страница 27: ...Safety 27 Apex 10 Apex 10H...
Страница 30: ...Installation 30 Apex 10 Apex 10H Figure 8a Floor Plan...
Страница 61: ...Parts Catalogue 61 Apex 10 Apex 10H Parts Catalogue ED 01 2015...