SmartROC D65 Tier 4 Final
2 General
24
Occurrence of wire breaks due to operating time.
Wire breaks occur first after a certain operating time depending on operating conditions
and subsequently occur more frequently.
If this is the case, the number of wire breaks in relation to the operating time should be de-
termined and documented.
This can then be used to estimate the future increase in wire breaks and the foreseeable
time point for scrapping.
Reduced elasticity
Under certain conditions, the cable loses its elasticity.
Reduced elasticity is difficult to detect. If in doubt, consult a specialist.
If the cable has lost elasticity, the following characteristics usually appear:
n
Decrease in cable diameter
n
Extension of the cable
n
No gap between individual wires and between the strands. This is caused by its com-
ponents being pressed together.
n
Fine, brown dust inside the strands.
n
Even if there are no visible wire breaks, the cable is noticeably stiffer.
n
The cable's diameter decreases more quickly than during normal wear of the individual
cable strands.
Reduced elasticity can lead to sudden cable breaks during heavy loads. The cable should
be scrapped.
Decrease in cable diameter
Decrease in cable diameter through material fatigue in the cable can have the following
causes:
n
Inner surface wear and surface wear nicks
n
Inner surface wear through friction between the strands and wires in the cable
n
Fatigue of plastic core
n
Break in steel core
n
Break in inner layer in multi-strand cable
If the cable's diameter decreases more than 10% in relation to the nominal diameter of the
cable, it must be scrapped.
It should be scrapped even if no wire breaks have been detected.
Certain number and type of wire breaks
The cable drums are designed in such a way that the cables do not have an unlimited ser-
vice life. Wire breaks can therefore occur during operation.
On 6 and 8-strand cables, wire breaks are primarily superficial.
The cables should be scrapped if the number of wire breaks specified in the table have
been detected
Number of load-
bearing wires in
the outer strand
1
n
Number of visible wire breaks
2
that require scrapping
Machine groups M1 and M2
Cross lay
Equal lay
Содержание SMARTROC D65 TIER 4 FINAL
Страница 2: ......
Страница 4: ......
Страница 10: ...SmartROC D65 Tier 4 Final Table of Contents x...
Страница 32: ...SmartROC D65 Tier 4 Final 2 General 32...
Страница 38: ...SmartROC D65 Tier 4 Final 3 Transport instructions 38...
Страница 50: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 50 Rig Layout Feeder Layout...
Страница 69: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 69 Rig Layout Feeder Layout...
Страница 86: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 86 Logging Signal Log Signal Log...
Страница 109: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 109 Drilling DCT DCT n Parameters n Actuations...
Страница 112: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 112 5 9 Rig 5 9 1 Rig menu Rig menu n Sensors n Actuations n Parameters...
Страница 113: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 113 Rig sensor Rig sensor n Power Pack n Wagon Frame...
Страница 120: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 120 Rig parameters Parameters n Tramming...
Страница 140: ...SmartROC D65 Tier 4 Final 6 Hydraulic systems 140...
Страница 157: ...SmartROC D65 Tier 4 Final 9 Dust collector DCT 157 Dust collector...
Страница 158: ...SmartROC D65 Tier 4 Final 9 Dust collector DCT 158...
Страница 160: ...SmartROC D65 Tier 4 Final 10 Radiator 160 Radiator and expansion tank...
Страница 170: ...SmartROC D65 Tier 4 Final 11 Diesel engine 170...
Страница 182: ...SmartROC D65 Tier 4 Final 12 Compressor and air system 182...
Страница 192: ...SmartROC D65 Tier 4 Final 13 Oil and fuel 192...
Страница 219: ...14 Options 219...
Страница 220: ...www atlascopco com 2015 12 17 No 713991051 3...