SmartROC D65 Tier 4 Final
2 General
17
Inspection and maintenance during the shutdown period
The following action must be carried out every month.
n
Check oil and coolant levels.
n
Start the diesel engine and let it run until normal operating temperature has been
reached.
n
Operate the rig a few metres back and forth so that the tramming gears are lubricated.
n
Operate the tilt cylinders, boom, feeder, drill support and rod handling so that all cylin-
ders reach their end positions.
n
Drain condensed water from the hydraulic oil tank and compressor oil tank.
2.1.7 Scaling
When the entire drill rig or part of the rig is to be scrapped, local regulations in force re-
garding handling, waste management, recycling and destruction must be followed. Collect
and dispose of:
n
Rest oil and oil spill
n
Oil waste such as filters
n
Rest fuel and fuel spill
n
Rest grease and grease spill
n
Batteries
n
Discarded refrigerant, air conditioning
n
Chemicals such as flushing additives, other additives and coolants
n
Metals, e.g. steel and aluminium (metals that are recyclable)
n
Plastics and rubber (often marked in various classifications for recycling)
n
Electrical components such as cables, electronics
n
Emissions cleaning unit
2.1.8 Tightening torque in bolted joints.
All joints are tightened to the torque required by Atlas Copco Standard K 4369 unless oth-
erwise specifically stated. In such cases, this will be specified in the maintenance instruc-
tions of the module in question.
Size
Strength class
Torque in Nm.
Tolerance ±
M6
8.8
8
2
M8
8.8
20
5
M10
8.8
41
10
M12
8.8
73
18
M14
8.8
115
25
M16
8.8
185
45
M20
8.8
355
85
M24
8.8
600
150
M12 x 1.25
10.9
135
6
M16 x 1.25
10.9
315
15
M18 x 1.25
10.9
460
20
Содержание SMARTROC D65 TIER 4 FINAL
Страница 2: ......
Страница 4: ......
Страница 10: ...SmartROC D65 Tier 4 Final Table of Contents x...
Страница 32: ...SmartROC D65 Tier 4 Final 2 General 32...
Страница 38: ...SmartROC D65 Tier 4 Final 3 Transport instructions 38...
Страница 50: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 50 Rig Layout Feeder Layout...
Страница 69: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 69 Rig Layout Feeder Layout...
Страница 86: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 86 Logging Signal Log Signal Log...
Страница 109: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 109 Drilling DCT DCT n Parameters n Actuations...
Страница 112: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 112 5 9 Rig 5 9 1 Rig menu Rig menu n Sensors n Actuations n Parameters...
Страница 113: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 113 Rig sensor Rig sensor n Power Pack n Wagon Frame...
Страница 120: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 120 Rig parameters Parameters n Tramming...
Страница 140: ...SmartROC D65 Tier 4 Final 6 Hydraulic systems 140...
Страница 157: ...SmartROC D65 Tier 4 Final 9 Dust collector DCT 157 Dust collector...
Страница 158: ...SmartROC D65 Tier 4 Final 9 Dust collector DCT 158...
Страница 160: ...SmartROC D65 Tier 4 Final 10 Radiator 160 Radiator and expansion tank...
Страница 170: ...SmartROC D65 Tier 4 Final 11 Diesel engine 170...
Страница 182: ...SmartROC D65 Tier 4 Final 12 Compressor and air system 182...
Страница 192: ...SmartROC D65 Tier 4 Final 13 Oil and fuel 192...
Страница 219: ...14 Options 219...
Страница 220: ...www atlascopco com 2015 12 17 No 713991051 3...