- 42 -
Check engine mounts
x
x
Check crankcase ventilation system
x
x
Check condition of cooling fan assembly
x
x
Pressure test cooling system
x
x
Check engine electrical ground connection
x
x
Replace air filter element (2)
x
x
Measure alternator insulation resistance
x
x
Check glycol level in coolant (4)
x
x
Check PH level of engine coolant (4)
x
x
Monitor Insulation Resistance of the main alternator
x
x
Replace safety cartridge
x
Check alternator and starter motor
x
Check electrical system for security of cables and wear
x
Test thermostats
x
Test glow plugs
x
Inspection by Atlas Copco Service technician
Generators in standby application have to be tested on a
regular basis. At least once a month the engine should run
for minimum 30 minutes at a high load (50% - 70%) that
the engine reaches its operating temperature.
!
Содержание QAS 14
Страница 1: ...QAS 14 20 Kd Instruction Manual for AC Generators English...
Страница 2: ......
Страница 80: ...80...
Страница 81: ...81 Circuit diagrams...
Страница 96: ...96...
Страница 98: ...98...
Страница 99: ......
Страница 100: ...Printed in Belgium 11 2010 2954 3380 04 www atlascopco com...