5.2
Before starting
Procedure
-
Check the oil level, top up if necessary. See section
5.3
Starting
Procedure
For the position of the air outlet valve and the drain connections, see sections
Control panel of Elektronikon I
Step
Action
-
Open the air outlet valve.
-
Switch on the voltage. Check that voltage on LED (6) lights up.
5.4
During operation
Warnings
The operator must apply all relevant
Removing the front panel (service panel) during operation will lead to an automatic
shutdown of the unit after a certain time depending of the compressor version.
When the motors are stopped and LED (8) (automatic operation) is alight, the motors may
start automatically.
Instruction book
64
API451763
Содержание GA18
Страница 1: ...INSTRUCTION BOOK API451763 GA 18 ...
Страница 2: ......
Страница 16: ...2 2 Air flow Flow diagrams Flow diagram GA Pack Instruction book 14 API451763 ...
Страница 56: ...4 Installation 4 1 Dimension drawings GA 15 up to GA 22 Floor mounted Pack Instruction book 54 API451763 ...
Страница 64: ...Position of oil level sight glass Electric cubicle Instruction book 62 API451763 ...
Страница 93: ......