Page 62 / 116
00CNO0183-C
CONDENSINOX -
Installation, Use and Maintenance
E. ELECTRICAL AND HYDRAULIC VALIDATION
On boiler no. 1: master
Line No.
Value
• Menu
Cascade troubleshooting
Con
fi
rm that all the boilers are present in the cascade
General status 1 (8100)
Released/not
released
General status 2 (8101)
Released/not
released
...............................
For a request via 0…10V input
• Menu
Input/output test
H1 voltage
H1 voltage signal (7840)
To be con
fi
rmed
against the voltage
sent by the boiler
room controller
For a request via LPB
If the boiler room regulator is con
fi
gured as a slave clock, it must retrieve
the date and time.
• Menu
Input/output test
Check the outputs
Alarm relay
Relay test (7700)
Relay QX1 output
Isolation valve Q1.1
Relay test (7700)
Relay QX3 output
Reset the outputs
Relay test (7700)
No test
Check the sensor values
Outdoor sensor B9
B9 exterior T° (7730)
in °C
Flow sensor B1
Sensor BX2 T° (7821)
in °C
• Menu
Configuration
Check the hydraulic diagram
Generator 1 control no. (6212)
14
Generator 2 control no. (6213)
0
DHW information (6215)
0
Information on heating circuits 3, 2 and 1 (6217)
0
Diagram: CX11.1
page 5 / 6
Содержание CONDENSINOX 100
Страница 2: ......
Страница 89: ...Published 09 2015 Page 89 116 CONDENSINOX Installation Use and Maintenance ...