Published: 09 / 2015
Page 59 / 116
CONDENSINOX -
Installation, Use and Maintenance
C. CUSTOMER ELECTRICAL CONNECTION
Boiler no. 1:
L
N Y1
N
Y2 L
N L
N L
N
QX2
QX3
QX1
AUX2 AUX1
BX2
Gnd
BX3
Gnd
B3
Gnd
B9
Gnd
H1
Gnd
H5
Gnd
230 VAC 50 Hz
power supply
}
}
}
}
Alarm relay
0 to 10V analogue
input
DB MB
}
Isolation
valve Q1.1
Cascade
fl
ow
sensor B10
INFORMATION:
If the isolation valve is not equipped with an automatic reset, connect the
isolation valve Q1.1 close contact to Y2.
LPB bus
Boiler no. 2:
INFORMATION:
If the isolation valve is not equipped with an automatic reset, connect the
isolation valve Q1.2 close contact to Y2.
Diagram: CX11.1
page 2 / 6
Содержание CONDENSINOX 100
Страница 2: ......
Страница 89: ...Published 09 2015 Page 89 116 CONDENSINOX Installation Use and Maintenance ...