CFT-QBL-9000E
Main control unit
Manual control unit
Linkage unit
Shenzhen Convoys Fire TechnologyCo.,Ltd.
Blank cover
Fig.2-4 CFT-QBL-9000 Dimensions
2.2 System installation
2.2.1 Unpacking inspection
It is necessary before installation to inspect the on-site equipment. After unpacking the box,
check the goods in it one by one according to the content of the packing list. The main content of
the check should cover the Installation and Operation Manual, the protector tubes, the spare
screws, the control panel key and so on. After checking the above, do necessary inspections for
the appearance of the fire alarm control panel. If any non-conformities are discovered in the check
or inspections, call our salespersons.
2.2.2 Engineering configuration inspection
Inspect whether the contents of the packing list of the control equipment complies with the
engineering configurations and matches with the design drawings or not.
2.2.3 Inspection of the internal configurations and connection condition of the
fire alarm control panel
Do simple routine inspections for the internal configurations of the fire alarm control panel,
such as the number of the interface boards, the number of the manual control panels, the power
-9-