15.

 

The GSCM will start a 30day exercise period of up to 1 hour run time, if the exercise time is set above 0 minutes (above 0V 
@ the test point, when in setup mode) and a reset has been applied for 30 seconds. If a DC voltage greater than 6V is 
connected to either terminal 11 or 12 the GSCM will exercise the generator with load or without load (energizing K5 load 
relay). If a voltage is not connected to either terminal, the GSCM will default to starting and running the exercise period 
with the K5 load relay energized. The 30 day exercise LED blinks once every minute if the exercise function is activated. 
The LED lights continuously and the open collector transistor switch (terminal 17) will pull in a user supplied 12 or 24VDC 
relay depending on supply voltage (coil current not to exceed 180 milliamps) whenever the generator is running in 
exercise mode. The 30 day exercise LED changes to a fast blink 60 seconds before the GSCM starts the generator in 
exercise mode. 

16.

 

If the DC voltage connected to either terminals 11 or 12 is supplied by a solar panel, the 30 day exercise will start in the 
morning when the solar panel’s voltage exceeds the 6VDC threshold voltage after the 30 day exercise cycle period has 
been reached. Otherwise the start cycle will be 30 days, +/- several hours after the module was powered up and the reset 
applied for 30 seconds to activate the 30 day exercise routine. Not having a solar panel connected to terminal 11 or 12 
may allow the generator to start in the middle of the night, disturbing yours or your neighbors sleep. 

17.

 

Battery equalization can be accomplished by using a relay on the 30 day exercise terminal 17 to switch a separate charge 
set to equalize mode, raising the battery voltage to equalization levels while the generator is running during its exercise 
period, (set exercise time to maximum of 60 minutes). A battery charger with an equalization operation is required for 
this application. 

GSCM Shutdown Conditions 

 

The GSCM detects several fault conditions (detection not enabled until the generator has been running for 15 seconds) and will 
immediately shutdown the generator, locking it out until a reset signal is received (shorting pins 7 and 8 momentarily). The open 
collector transistor terminal 18 will energize a user supplied DC relay (not exceeding 180 milliamp coil current) whenever a fault 
shutdown occurs and will de-energize the relay when the fault is reset. The shutdown conditions are as follows: 

 

1.

 

Failure to start with 4 cranking attempts. See GSCM STARTING SEQUENCE section: 4-5. The max crank/ max runtime fault 
LED blinks rapidly. 

2.

 

Low oil pressure condition is detected 15 seconds after run condition is verified in the load delay period. Terminal 9 is 
connected to ground by the oil pressure sensor. The emergency shutdown LED blinks slowly. 

3.

 

High temperature condition is detected 25 seconds after K5 (load transfer) relay is energized. Terminal 10 is connected to 
ground by temperature sensor. The emergency shutdown LED blinks fast. 

4.

 

High frequency (over speed) condition (must be activated in setup mode). The generators AC frequency is monitored, 25 
seconds after K5 (load transfer) relay is energized, on terminals 13 and 14. If the frequency exceeds the 15 to 75 Hz 
adjustment for 10 seconds, the GSCM shuts down the generator and the frequency shutdown LED blinks rapidly. The over 
Hz LED blinks during the 10 seconds it over frequency. The factory default setting is 0 de-activated. 

5.

 

Low frequency (under speed) condition (must be activated in setup mode). The generators AC frequency is monitored, 25 
seconds after K5 (load transfer) relay is energized, on terminals 13 and 14. If the frequency drops below the 15 to 75 Hz 
adjustment for 10 seconds, the GSCM shuts down the generator and the frequency shutdown LED blinks slowly. The 
under Hz LED blinks during the 10 seconds it over frequency. The factory default setting is 0 de-activated. 

6.

 

Maximum runtime of 12 hours is exceeded See AUTOMATIC STARTING FOR BATTERY CHARGING: 5. The max crank/ max 
runtime fault LED blinks slowly. 

7.

 

Loss of AC feedback signal while in run mode (K5 load relay energized). The GSCM begins monitoring the generator’s AC 
voltage 25 seconds after K5 (load transfer) relay is energized, on terminals 13 and 14. If the AC voltage is lost for more 
than 60 seconds will cause the GSCM to go through its shutdown sequence. The generator Hz LED will blink three times, 
rest, blink three times to indicate the fault condition. Possible causes: generator ran out of fuel, load tripped the 
generators circuit breaker(s), broken or intermittent connection between the generator’s AC connection points and the 
GSCM’s terminals 13 and 14. 

 

 

Содержание A0217

Страница 1: ...Generator Start Control Module Part GSCM Rev C Code Version 5 13 ATKINSON ELECTRONICS INC 14 West Vine Street Murray Utah 84107 ...

Страница 2: ... not already running before trying to start a second or third time Features Applications Automatic starting load transfer and shutdown for gas and diesel generators Off grid generators Automatic adjustable voltage set points for generator battery charging applications 0 60VDC Works with 12 24 or 48V battery systems Provides fault shutdown for low oil pressure high temperature and under speed or ov...

Страница 3: ...e is set at 0 de activated The GSCM provides a 30 day exercise function which can be synchronized with a photo voltaic input to only start each 30 day period at the beginning of the solar charge day A user supplied DC relay can be energized during the 30 day generator exercise to override a battery charger and allow the battery bank to equalize by charging the batteries above the normal charger cu...

Страница 4: ...www atkinsonelectronics com Circuit Board Division 800 261 3602 4 Revised 09 18 GSCM Wiring Diagram ...

Страница 5: ...e maximum crank lockout condition This lockout condition remains until the GSCM is reset by momentarily shorting the reset terminals 7 and 8 together after which the start LED blinks for 60 seconds and then enters ready mode Powering down the GSCM for 5 seconds and powering it back up will also clear the maximum crank lockout condition with the GSCM returning to ready mode 6 When the generator sta...

Страница 6: ...ins 7 and 8 momentarily The open collector transistor terminal 18 will energize a user supplied DC relay not exceeding 180 milliamp coil current whenever a fault shutdown occurs and will de energize the relay when the fault is reset The shutdown conditions are as follows 1 Failure to start with 4 cranking attempts See GSCM STARTING SEQUENCE section 4 5 The max crank max runtime fault LED blinks ra...

Страница 7: ... will shut down the generator and indicate a maximum runtime fault by slowly blinking the max crank max runtime LED See GSCM SHUTDOWN CONDITIONS section 6 This runtime fault is only active in the automatic starting mode 6 The GSCM will clear the max runtime fault if the reset terminals 7 8 are momentarily shorted a manual start signal is applied to terminals 5 6 or a period of 12 hours passes from...

Страница 8: ...e to 0VDC store setting advance to high Hz position and set to zero volts both must be set 9 To re enable the 5 and 10 minute time delays the GSCM must enter adjustment mode as in paragraph 1 of this section and then the cut in and cut out adjustment re entered and stored without the jumper between terminals 15 and 16 Restoring the GSCM factory default values as described in GSCM Reset Conditions ...

Страница 9: ...ad transfer 0 120 Second Load Pre Off Blinking load disconnected cool down period before shutdown Battery Charge Cut In x12 Blinking battery voltage lower than cut in point during 5 minute delay Battery Charge Cut Out x12 Blinking battery voltage greater than cut out point during 10 minute delay 15 75Hz Under Hz Shutdown Blinking generator Hz under speed less than trip point during 10 second delay...

Страница 10: ...rank Delay 5 second minimum 60 seconds Maximum crank time Will not energize starter 60 seconds Load transfer delay Ignition and load relays energize together 60 seconds Load pre off delay Ignition and load relays de energize together 120 seconds Battery charge cut in Ignores automatic battery charge function Switched auto start Battery charge cut out Ignores automatic battery charge function Switc...

Страница 11: ...e generator has reached 30Hz or half speed If this setting doesn t allow the start input to remain engaged long enough for the generator to stay on line adjust the run disconnect setting to 55Hz See GSCM INITALIZATON AND ADJUSTMENT for changing adjustments The K4 shutdown relay provides a momentary stop signal until the generator AC Hz has dropped to zero The K3 ignition relay provides a continuou...

Страница 12: ...rations are shown for both automotive and magneto type with or without fuel valves High speed 3600 RPM generators may need the crank disconnect hertz adjustment set to 20Hz or less to avoid over driving the starter Low Speed Gas Propane Generator with Safeties The low speed gas propane generators also wire the same as in application 2 However the installer should determine ignition type and oil an...

Страница 13: ...ession solenoid furnished with the generator must be wired to K4 shutdown relay to energize on shutdown Automatic Generator Powered AC Pump In this application the GSCM is connected to a pressure or level switch into the battery sense terminals To make the appropriate cut in and cut out adjustments See AUTOMATIC STARTING FOR BATTERY CHARGING section 9 The cut in and cut out adjustments must be set...

Страница 14: ...a special low voltage generator frequency input version for 12V alternator applications GSCM 12V ALT 255 Hz See AUTOMATIC STARTING FOR BATTERY CHARGING section 9 4 9 Generator Powered Air Conditioner The room thermostat should be line voltage slow action type to minimize short cycling signals the generator to start The GSCM K5 load transfer relay starts the air conditioner after the generator is r...

Страница 15: ...ter the GSCM starts the generator with a 3 wire start stop or any other generator starting application to match the type of generator to be controlled If the user desires the voltage from the generator s battery may be connected to the GSCM on terminal 4 and the GSCM will start the generator automatically to charge its own battery when the voltage falls below the battery cut in threshold voltage T...

Страница 16: ...m the date of shipment by Atkinson Electronics Inc or its authorized distributors to the original Customer Atkinson Electronics Inc will repair or replace at our option any defective products provided that our inspection discloses that such defects developed under normal and proper use This warranty does not extend to goods subjected to misuse neglect accident or improper installation or to mainte...