2.2 Master Plate Installation
Tools required: 6 mm hex key, toque wrench
Supplies required: Clean rag, Loctite
®
242
1. Clean the mounting surfaces.
2.
Align the dowel pins to the corresponding holes in the Master plate. Secure the Master plate to the robot
arm or interface plate with customer supplied (6) M8 socket head cap screws using a 6 mm hex key. If
not pre‑applied, apply Loctite 242 to threads (see
for proper fasteners and torque).
NOTICE:
If an ATI interface plate is used, fasteners to mount the Master plate are supplied with
the interface plate.
3. Connect utilities to the appropriate module and Master plate connections.
4.
Safely resume normal operation.
Figure 2.1—Master Plate Installation
Robot Arm
Master Plate
Dowel Pin
(Customer Supplied)
M8 Socket Head Cap Screw
(Customer Supplied)
(See Table 2.1)
2.3 Master Plate Removal
Tools required: 6 mm hex key
1.
Place the Tool in a secure location.
2.
Uncouple the Master and Tool plates.
3. Turn off and de‑energize all energized circuits; for example, electrical, air, water, etc.
4. Disconnect all utilities.
5. While supporting the Master plate, remove the customer supplied (6) M8 socket head cap screws that
connect the Master plate to the robot arm or interface plate using a 6 mm hex key.
6. Remove the Master plate.