Manual, Tool Changer, QC‑50
Document #9620‑20‑B‑50 Tool Changer‑04
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 •
B-26
5.2.2 Rubber Bushing Replacement
Parts required: Refer to
Tools required: needle nose pliers
1.
Place the Tool in a secure location.
2.
Uncouple the Master and Tool plates.
3. Turn off and de‑energize all energized circuits; for example, electrical, air, water, etc. If
required, fully disconnect these circuits.
4.
Using needle nose pliers, grasp the rubber bushing and pull it out of the Master body. Refer to
5. Lightly lubricate the new rubber bushing and push into the Master body (refer to
.
6.
Safely resume normal operation.
Figure 5.2— Rubber Bushing Replacement
(4) 1/4" Rubber Bushing
(16) M5 Rubber Bushing
Master Plate