Electrical Connection
General and local regulations must be observed. Therefore, these steps may only be
carried out by a trained professional.
Pay attention to the necessary supply line (see technical data).
The connection should be made with a 230V Schuko plug or 5-pole 16 A CEE plug (partially included).
Voltage deviations should be 0.9 - 1.1 times the nominal voltage range and the frequency deviation should
be 0.99 - 1.01 times the frequency range.
Necessary protective measures must be taken to guarantee this.
At the end of the work, the direction that the motor rotates (at 400V) must be checked.
2.7
Pneumatic Connection
For all pneumatic systems, a compressed air maintenance unit (partially included) must
be installed between the supply line and the system.
The air pressure of the supply line must at least correspond to the technical data.
The compressed air maintenance unit must be set correctly and checked.
The compressed air maintenance unit must be serviced at regular intervals.
The maximum or minimum pressure ensures perfect functioning without any damage.