
PN5212 / PN5320 User Manual
44
After you have made your schedule settings, click
Add
. The schedule is
summarized in the list at the bottom of the panel.
To remove the outlet’s schedule, select it in the list and click
Delete
.
Restart Time
Key in the time of day you want the restart to take place using
the HH:MM format.
If you want to temporarily suspend this function without deleting
the entry, click to put a check in the
Disable
checkbox at the
right of this field. You can reinstate the function by unchecking
the checkbox.
Every
For added flexibility, you can use this field to refine the Daily,
Weekly, and Monthly routines. For example, if you chose
Daily
as your routine type, you could have the routine take place
every 3 days (instead of every day), by keying a 3 in this field.
Heading
Meaning
Содержание Altuscn PN5212
Страница 1: ...Power Over the NET PN5212 PN5320 Power Distribution Unit User Manual www aten com ...
Страница 11: ...PN5212 PN5320 User Manual xi Administrator Login Failure 133 Specifications 134 Limited Warranty 135 ...
Страница 19: ...Chapter 1 Introduction 5 Components Front View PN5320 NEMA PN5320 IEC 1 3 1 2 4 6 5 2 ...
Страница 26: ...PN5212 PN5320 User Manual 12 3 5 4 2 1 SA0151 DTE ...
Страница 36: ...PN5212 PN5320 User Manual 22 This Page Intentionally Left Blank ...
Страница 90: ...PN5212 PN5320 User Manual 76 Security The Security page controls access to the Power Over the NET device ...
Страница 98: ...PN5212 PN5320 User Manual 84 This Page Intentionally Left Blank ...
Страница 104: ...PN5212 PN5320 User Manual 90 This Page Intentionally Left Blank ...
Страница 110: ...PN5212 PN5320 User Manual 96 This Page Intentionally Left Blank ...
Страница 150: ...PN5212 PN5320 User Manual 136 This Page Intentionally Left Blank ...