
Chapter 5. Outlet Access
43
Schedule
Clicking the
Schedule
tab brings up a page that lets you set up a scheduled
power On/Off configuration for the selected outlet:
The meanings of the field headings are given in the table, below:
Heading
Meaning
Routine Type
Drop down the list to select whether the scheduled power
configuration should take place just Once, or on a Daily,
Weekly, or Monthly basis.
Week Day
This field only becomes active if you choose
Weekly
as the
routine type. If you choose Weekly, drop down the list to choose
which day of the week you want the power management routine
to take place on.
Date
This field only becomes active if you choose
Monthly
as the
routine type. If you choose Monthly, drop down the list to
choose which day of the month you want the power
management routine to take place on.
Start Date
If you want to limit the power management routine to a
particular time period, either click the calendar icon to select the
date that the routine will start at, or key in a start date using the
YYYY-MM-DD format
End Date
If you want to limit the power management routine to a
particular time period, either click the calendar icon to select the
date that the routine will end at, or key in an end date using the
YYYY-MM-DD format
Shutdown Time
Key in the time of day you want the shutdown to take place
using the HH:MM format.
If you want to temporarily suspend this function without deleting
the entry, click to put a check in the
Disable
checkbox at the
right of this field. You can reinstate the function by unchecking
the checkbox.
Содержание Altuscn PN5212
Страница 1: ...Power Over the NET PN5212 PN5320 Power Distribution Unit User Manual www aten com ...
Страница 11: ...PN5212 PN5320 User Manual xi Administrator Login Failure 133 Specifications 134 Limited Warranty 135 ...
Страница 19: ...Chapter 1 Introduction 5 Components Front View PN5320 NEMA PN5320 IEC 1 3 1 2 4 6 5 2 ...
Страница 26: ...PN5212 PN5320 User Manual 12 3 5 4 2 1 SA0151 DTE ...
Страница 36: ...PN5212 PN5320 User Manual 22 This Page Intentionally Left Blank ...
Страница 90: ...PN5212 PN5320 User Manual 76 Security The Security page controls access to the Power Over the NET device ...
Страница 98: ...PN5212 PN5320 User Manual 84 This Page Intentionally Left Blank ...
Страница 104: ...PN5212 PN5320 User Manual 90 This Page Intentionally Left Blank ...
Страница 110: ...PN5212 PN5320 User Manual 96 This Page Intentionally Left Blank ...
Страница 150: ...PN5212 PN5320 User Manual 136 This Page Intentionally Left Blank ...