background image

AWM-AD Page 4 of 4

8. 

Cable management

8.1

 Plug cables into the monitor and 

route the cables down the arm using 

the cable hooks and clips.

atdec.com | atdec.co.uk | atdec.com.au

No portion of this document or any artwork contained herein should be reproduced in any way without 
the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer 
reserves the right to alter specifications without notice. ©20180724

See steps

 8.2 

to

 8.4

8.2

 Wedge cable into the central gap 

and slide it down the arm.

8.3

 The cable should slip into the arm cavity

8.4

 Slide the remaining loose cable 

from the central gap up the arm.

Important!

  

Ensure enough cable slack is 

given in this area to allow for 

movement of the monitor.

Отзывы: