5.1 Wall-mounted in line
A . Position the pipe work header against the wall. When using several pipe work head-
ers: couple the pipe work headers and supplied gaskets, M12 (DN65) or M16 (DN100)
bolts, spring washers and nuts. Align the pipe work header(s) horizontally using the
adjustable feet.
B. Determine the position of the suspension brackets based on figure 5.1.c. The boil
-
ers can be fitted on the wall using the supplied suspension brackets and mounting
material (minimum of 3 screws for each boiler). The wall has to be flat and strong
enough to carry the weight of all boilers including their water contents.
Figure 5.1.a
Figure 5.1.c
measurements in mm
Figure 5.1.b
C. Hang the boilers on the suspension brackets.
Lift the boiler only by the special grips on the bottom panel (1) and support
the boiler by its rear panel (2). Refer to figure 5.1.d.
D. Place the gas line in its intended recess. When using several pipe work headers:
couple the gas lines using the supplied DN50/DN65 gaskets, M12 bolts, spring
washers and nuts. Refer to figure 5.1.e.
Fasten the gas line with the 2 special close tolerance bolts M6x8x16 on each
flange of the pipe work header(s). Refer to figure 5.1.f.
Continue with chapter 5.4
Figure 5.1.d
Figure 5.1.e
Figure 5.1.f
1
1
2
2
Lifting and carrying precautions:
- Lift only a manageable weight, or ask for help.
- When lifting the boiler, bend the knees, and keep the back straight and feet apart.
- Do not lift and twist at the same time.
- Lift and carry the boiler close to the body.
- Wear protective clothing and gloves to protect from any sharp edges.