58
Standard Schemes
ATAG XL
-
W + 1 Mixing c1 Direct c Domestic Hot Water +Low loss header
Electrical connections
A :
Main power supply (230V @50Hz)
B :
Clip In power (230V @50Hz)
Ch.P :
DHW Charging pump(
230/120 VAC, 1A
max)
CP:
DHW re
-
circulating pump (
230 VAC, 2A max)
T10:
Common flow temperature sensor (10K
Ω )
C:
DHW re
-
circulating temperature sensor(10K
Ω )
T3:
DHW temperature sensor(10K
Ω )
D :
Clip
-
In 3 zone
RT1:
Room thermostat (On/Off )
RT2:
Room thermostat (On/Off )
T7 :
Outdoor sensor (optional)(1K
Ω )
A :
Mixing Valve HC2
B :
Heating circuit pump HC1
C :
Heating circuit pump HC2
D:
Flow sensor HC2
E:
Clip In connection to boiler Ebus Input
F:
DIP
-
switch 2 must be set in ON position
G:
Main power connection to boiler board
BOILER MOTHERBOARD
CLIP
-
IN ZONE MANAGER
Содержание XL-W 105
Страница 2: ...2...
Страница 27: ...27 Technical description Declaration of conformity...
Страница 44: ...44 Boiler Installation Electrical connection...
Страница 45: ...45 Boiler Installation Electrical connection...
Страница 52: ...52 Boiler Installation Electrical connection Cascade control...
Страница 68: ...68 Accessories Hydraulics Single boiler Dimensional sketch for 3905173 LLH dT10 20K WALL HUNG TLPLUS...
Страница 77: ...77 Accessories Cascade Low loss headers Dimensional sketch for 3905176 LLH DN100 DUO...