background image

User manual ATAG iC, iS and iR-Range 

12

Filling procedure

Combi boiler (iC-Range):

The iC-Range boiler is provided with a filling loop.

Connect the filling loop between cold water 

connection (1) and CH connection (2)

-   Open slowly the valves (A and B) of the filling 

loop;

-   Read the water pressure from the pressure 

gauge under the boiler or from the display 

according to the procedure described above 

and wait until the pressure reaches between 1.0 

and 1.2 bar;

-   Close both valves (A and B) of the filling loop.

Always disconnect the filling loop and close the 

valves with the cap nut (3).

System boiler (iS-Range)

The heating system connected to the iS-Range 

boiler is provided with a filling loop.

Connect the filling loop between cold water tap and 

the connection on the heating system

-   Open slowly the valves of the filling loop

-   Read the water pressure from the pressure

 

gauge under the boiler or from the display according to the procedure described above 

and wait until the pressure reaches 1.2 bar.

-   Close both valves of the filling loop

Always disconnect the filling loop.

Regular boiler (iR-Range)

This boiler is part of an 'Open Vent' heating system. The system is not pressurized, but is 

filled automatically by a filling system in the loft.

If there is a problem with this system, please contact your installer.

When the heating system is filled and after a power interruption the boiler will be reset 

and starts with a air purge program. The automatic air purge program will take approx. 7 

minutes and will be followed by the home screen if the water pressure is above 0.8 bar 

(pressure reading for iC & iS boilers only).

OPEN

CLOSED

OPEN

CLOSED

1

2

A

B

3

Figure 1

Содержание IC series

Страница 1: ...U s e r m a n u a l 8G 52 86 00 10 18 Changes reserved iC Range iS Range iR Range...

Страница 2: ...er information 8 4 3 Pump function Boiler frost protection 10 5 Filling the heating system 11 6 Error codes 13 7 Maintenance 14 8 Warranty 14 9 Disposal of the product 14 Important It is in your own i...

Страница 3: ...manual fully before operating the boiler In case of doubt or errors contact your installer ATAG Heating Technology Ltd reserves the right to change the specifications and dimensions without prior noti...

Страница 4: ...a full and clear explanation of its operation The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wale...

Страница 5: ...vised not to play with the appliance If you smell gas No naked flames No smoking Do not switch lights on or off or use other electrical switches Do not use the phone Close the gas mains Open windows a...

Страница 6: ...r opening the door just pull at the door handle After opening the flap you will find on the inside of the flap a brief overview of the meaning of all the buttons and icons These are described hereafte...

Страница 7: ...creen press OK 2 Turn the selector wheel to highlight Complete Menu Press OK 3 Turn the selector wheel to highlight DHW Settings Press OK 4 Option DHW Comfort Setpoint Temp is highlighted Press OK 5 T...

Страница 8: ...at the same time for 7 seconds 2 Turn the selector wheel to highlight 007 as the Technical Code Press OK 3 Turn the selector wheel to highlight Complete Menu Press OK It is now loading the menu As an...

Страница 9: ...able below 8 2 2 Fan Speed in Rpm 8 2 5 DHW Flow Rate in l min 8 2 8 Gas Power in kW 8 2 9 Heating circuit pressure in bar 8 3 0 CH Flow Set T in C 8 3 1 CH Flow T in C 8 3 2 CH Return T in C 8 3 3 DH...

Страница 10: ...st damage to the CH installation it is advisable to let the pump run continuously proceed as follows 1 From the controller Home screen press OK 2 Turn the selector wheel to highlight Complete Menu Pre...

Страница 11: ...he installation should be refilled Water pressure is too low 0 5 bar The boiler is taken out of operation The installation should be refilled Air purge program After the installation has been refilled...

Страница 12: ...er tap and the connection on the heating system Open slowly the valves of the filling loop Read the water pressure from the pressure gauge under the boiler or from the display according to the procedu...

Страница 13: ...he Reset button message appears on the screen An overview of the most common blocking and error codes are listed below 101 Overheat 102 Pressure Sensor Error 104 Flow Check Failed 108 Pressure Pmin 0...

Страница 14: ...handing it in at a duly authorized reseller when purchasing a similar product or at an authorized collection site for recycling products which contains electrical and electronic equipment EEE and bat...

Страница 15: ...User manual ATAG iC iS and iR Range 15...

Страница 16: ...o change the specifications and dimensions without prior notice E O E ATAG Heating Technology Ltd 80 Churchill Square Business Centre Kings Hill West Malling Kent ME19 4YU P h o n e 0 8 0 0 2 5 4 5 0...

Отзывы: