User manual ATAG iC, iS and iR-Range
12
Filling procedure
Combi boiler (iC-Range):
The iC-Range boiler is provided with a filling loop.
Connect the filling loop between cold water
connection (1) and CH connection (2)
- Open slowly the valves (A and B) of the filling
loop;
- Read the water pressure from the pressure
gauge under the boiler or from the display
according to the procedure described above
and wait until the pressure reaches between 1.0
and 1.2 bar;
- Close both valves (A and B) of the filling loop.
Always disconnect the filling loop and close the
valves with the cap nut (3).
System boiler (iS-Range)
The heating system connected to the iS-Range
boiler is provided with a filling loop.
Connect the filling loop between cold water tap and
the connection on the heating system
- Open slowly the valves of the filling loop
- Read the water pressure from the pressure
gauge under the boiler or from the display according to the procedure described above
and wait until the pressure reaches 1.2 bar.
- Close both valves of the filling loop
Always disconnect the filling loop.
Regular boiler (iR-Range)
This boiler is part of an 'Open Vent' heating system. The system is not pressurized, but is
filled automatically by a filling system in the loft.
If there is a problem with this system, please contact your installer.
When the heating system is filled and after a power interruption the boiler will be reset
and starts with a air purge program. The automatic air purge program will take approx. 7
minutes and will be followed by the home screen if the water pressure is above 0.8 bar
(pressure reading for iC & iS boilers only).
OPEN
CLOSED
OPEN
CLOSED
1
2
A
B
3
Figure 1