User manual ATAG iC, iS and iR-Range
4
The Benchmark Scheme
ATAG Heating Technology Ltd is a licensed member of the Benchmark Scheme which aims
to improve the standards of installation and commissioning of domestic heating and hot
water systems in the UK and to encourage regular servicing to optimise safety, efficiency
and performance.
Benchmark is managed and promoted by the Heating and Hotwater Industry Council. For
more information visit www.centralheating.co.uk
Please ensure that the installer has fully completed the Benchmark Checklist on the inside
back pages of the installation instructions supplied with the product and that you have
signed it to say that you have received a full and clear explanation of its operation. The
installer is legally required to complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and Wales).
All installations must be notified to Local Area Building Control either directly or through
a Competent Persons Scheme. A Building Regulations Compliance Certificate will then
be issued to the customer who should, on receipt, write the Notification Number on the
Benchmark Checklist.
This product should be serviced regularly to optimise its safety, efficiency and performance.
The service engineer should complete the relevant Service Record on the Benchmark
Checklist after each service.
The Benchmark Checklist may be required in the event of any warranty work and as
supporting documentation relating to home improvements in the optional documents
section of the Home Information Pack.