background image

User manual ATAG iC, iS and iR-Range 

4

The Benchmark Scheme

ATAG Heating Technology Ltd is a licensed member of the Benchmark Scheme which aims 

to improve the standards of installation and commissioning of domestic heating and hot 

water systems in the UK and to encourage regular servicing to optimise safety, efficiency 

and performance.

Benchmark is managed and promoted by the Heating and Hotwater Industry Council. For 

more information visit www.centralheating.co.uk

Please ensure that the installer has fully completed the Benchmark Checklist on the inside 

back pages of the installation instructions supplied with the product and that you have 

signed it to say that you have received a full and clear explanation of its operation. The 

installer is legally required to complete a commissioning checklist as a means of complying 

with the appropriate Building Regulations (England and Wales).

All installations must be notified to Local Area Building Control either directly or through 

a Competent Persons Scheme. A Building Regulations Compliance Certificate will then 

be issued to the customer who should, on receipt, write the Notification Number on the 

Benchmark Checklist.

This product should be serviced regularly to optimise its safety, efficiency and performance. 

The service engineer should complete the relevant Service Record on the Benchmark 

Checklist after each service.

The Benchmark Checklist may be required in the event of any warranty work and as 

supporting documentation relating to home improvements in the optional documents 

section of the Home Information Pack.

Содержание IC series

Страница 1: ...U s e r m a n u a l 8G 52 86 00 10 18 Changes reserved iC Range iS Range iR Range...

Страница 2: ...er information 8 4 3 Pump function Boiler frost protection 10 5 Filling the heating system 11 6 Error codes 13 7 Maintenance 14 8 Warranty 14 9 Disposal of the product 14 Important It is in your own i...

Страница 3: ...manual fully before operating the boiler In case of doubt or errors contact your installer ATAG Heating Technology Ltd reserves the right to change the specifications and dimensions without prior noti...

Страница 4: ...a full and clear explanation of its operation The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wale...

Страница 5: ...vised not to play with the appliance If you smell gas No naked flames No smoking Do not switch lights on or off or use other electrical switches Do not use the phone Close the gas mains Open windows a...

Страница 6: ...r opening the door just pull at the door handle After opening the flap you will find on the inside of the flap a brief overview of the meaning of all the buttons and icons These are described hereafte...

Страница 7: ...creen press OK 2 Turn the selector wheel to highlight Complete Menu Press OK 3 Turn the selector wheel to highlight DHW Settings Press OK 4 Option DHW Comfort Setpoint Temp is highlighted Press OK 5 T...

Страница 8: ...at the same time for 7 seconds 2 Turn the selector wheel to highlight 007 as the Technical Code Press OK 3 Turn the selector wheel to highlight Complete Menu Press OK It is now loading the menu As an...

Страница 9: ...able below 8 2 2 Fan Speed in Rpm 8 2 5 DHW Flow Rate in l min 8 2 8 Gas Power in kW 8 2 9 Heating circuit pressure in bar 8 3 0 CH Flow Set T in C 8 3 1 CH Flow T in C 8 3 2 CH Return T in C 8 3 3 DH...

Страница 10: ...st damage to the CH installation it is advisable to let the pump run continuously proceed as follows 1 From the controller Home screen press OK 2 Turn the selector wheel to highlight Complete Menu Pre...

Страница 11: ...he installation should be refilled Water pressure is too low 0 5 bar The boiler is taken out of operation The installation should be refilled Air purge program After the installation has been refilled...

Страница 12: ...er tap and the connection on the heating system Open slowly the valves of the filling loop Read the water pressure from the pressure gauge under the boiler or from the display according to the procedu...

Страница 13: ...he Reset button message appears on the screen An overview of the most common blocking and error codes are listed below 101 Overheat 102 Pressure Sensor Error 104 Flow Check Failed 108 Pressure Pmin 0...

Страница 14: ...handing it in at a duly authorized reseller when purchasing a similar product or at an authorized collection site for recycling products which contains electrical and electronic equipment EEE and bat...

Страница 15: ...User manual ATAG iC iS and iR Range 15...

Страница 16: ...o change the specifications and dimensions without prior notice E O E ATAG Heating Technology Ltd 80 Churchill Square Business Centre Kings Hill West Malling Kent ME19 4YU P h o n e 0 8 0 0 2 5 4 5 0...

Отзывы: