
Chapter 2: Hardware Information
2-6
9.
Twist each of the four screws with a
screwdriver just enough to attach the
heatsink to the motherboard. When the
four screws are attached, tighten them
one by one in a diagonal sequence to
completely secure the heatsink.
The heatsink screws are T20 models.
A torque value of 12 inch-lbf is
recommended.
10. Reinstall the air ducts to complete the CPU and heatsink installation.
Содержание RS700A-E9 V2 Series
Страница 1: ...1U Rackmount Server User Guide RS700A E9 Series V2 RS700A E9 RS4V2 RS700A E9 RS12V2 ...
Страница 28: ...Chapter 1 Product Introduction 1 18 ...
Страница 94: ...Chapter 2 Hardware Information 2 66 ...
Страница 100: ...Chapter 4 Motherboard Information 4 2 4 1 Motherboard layout ...
Страница 109: ...ASUS RS700A E9 Series V2 4 11 5 BMC LED BMCLED1 The BMC LED lights up to indicate that the on board BMC is functional ...
Страница 122: ...Chapter 4 Motherboard Information 4 24 ...
Страница 145: ...5 23 ASUS RS700A E9 Series V2 5 4 14 iSCSI Configuration Allows you to configure the iSCSi parameters ...
Страница 174: ...5 52 Chapter 5 BIOS Setup ...
Страница 184: ...6 10 Chapter 6 Driver Installation ...
Страница 185: ...Appendix Appendix This appendix includes additional information that you may refer to when configuring the motherboard ...
Страница 186: ...A 2 Appendix KNPP D32 R block diagram ...