Chapter 3: Installation Options
3-4
Outer rail
Intermediate rail
Intermediate rail
Inner rail
Blue release tab
White release tab
Spring lock
Rear end of rack rail
Rear rack post
3.
Press the spring lock on the rear end
of the rack rail and insert the studs into
the selected mounting holes on the rear
rack post.
4.
Slide the intermediate rail out of the outer rail until it clicks to a stop.
5.
Slide the inner rail out of the intermediate rail until it clicks to a stop. Slide the white
release tab outwards and remove the inner rail completely from the intermediate rail.
6.
Repeat steps 2 to 5 for the other rack rail.
Ensure that the installed rack rails (left and right) are aligned, secured, and stable in place.
The blue release tab is available on 1200 mm rack rails. This blue release tab is used to
further extend or retract the inner rail.
Содержание ESC8000 4G Series
Страница 1: ...4U Rackmount Server ESC8000 G4 Series User Guide ...
Страница 22: ...Chapter 1 Product Introduction 1 12 ...
Страница 69: ...3 7 ASUS ESC8000 G4 Series 1 2 3 4 5 6 7 8 1 2 3 ESC8000 G4 Series Front View ...
Страница 74: ...4 2 Chapter 4 Motherboard Information 4 1 Z11PG D24 Series Motherboard layout ...
Страница 98: ...4 26 Chapter 4 Motherboard Information ...
Страница 158: ...6 18 Chapter 6 RAID Configuration ...
Страница 174: ...2 Appendix ESC8000 G4 block diagram Single Root ESC8000 G4 block diagram Dual Root ...
Страница 175: ...3 ASUS ESC8000 G4 Series ESC8000 G4 10G block diagram Single Root ESC8000 G4 10G block diagram Dual Root ...
Страница 186: ...14 Appendix ...