![Associated Research LVB-2 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/associated-research/lvb-2/lvb-2_instruction-sheet_2989482009.webp)
© Associated Research 2016
9
LVB-2 Instruction Sheet
On the test instrument the Probe Configuration is programmed depending on the type of leakage test needed to
be performed. The figure below shows
Instrument Connections (OMNIA 2)
The diagram below shows all the connections needed to be made between the OMNIA 2 and the LVB-2:
1. DUT Output connections - Line, Neutral and Ground of the DUT outputs connect to the DUT adapter box.
2. DUT Adapter box – DUT adapter box for connection of Line, Neutral and Ground to the LVB-2 connector terminal.
3. L, N and G connections – This is the socket for the standard IEC320 connector. The line cord from the DUT adapt-
er box connects these ports for making the Line, Neutral and Ground connections to the LVB-2 box.
4. Probe connections (OMNIA 2) – Probe Hi and Probe Lo ports on the OMNIA 2.
5. Probe connections (LVB-2) – Probe Hi and Probe Lo connections on the LVB-2.
Figure 3 - OMNIA 2 Probe Configuration Setup