Issue 7-23-2007

Besam ICU/CCU - Equal or Unequal Panel  

16
© Copyright 2007 Besam Entrance Solutions.  May not be reprinted or reproduced without permission.

Mechanical Installation

Checking – Marking out – Fastening

 

Besam  jambs  are  factory  prepared  for  header  installa-

tion. Mount jambs to header using five screws per jamb. 

See Fig. 2. 
• Drill holes at the top, middle and bottom of

the jambs for securing to the door opening, adjusting 

for site conditions that may require the holes to be at a 

certain height. 

• Drill 1/2" holes through the face of the jamb 

and then drill the back holes to a maximum of 1/4". 

Suggested methods for attaching the jambs in which the 

screw holes are not exposed are as follows:

1. Install “U” shaped clips to the floor in which the 

jambs will slide over the top. Drill a hole through 

the jamb and clip to attach the bottom of the door. 

Drill a hole through the jamb inside of the header 

to attach the top of the jamb.  
2. Countersink the holes on the exterior jamb walls 

in line with the sidelite such that the sidelite  

covers the holes when installed.
3. Drill holes through both the interior and exterior 

jamb wall and install beauty caps on the exterior 

holes.

Leveling header and jambs

Note!  The header and jambs must be square and level to ensure a proper installation!

1.  Inspect the rough door opening, measuring from side to side and using a level, to find areas where 

shims may be needed. Look for high spots in the floor (see Fig. 1 page 15); if there is a slight rise 
in the floor at any point then the bottom of the jambs should be set level with the highest point of 
the floor, with the header leveled across the opening. 

2.  Tilt header/jamb assembly up into rough opening in wall.
3.  Start with one jamb. Loosely install the middle fastener, using a level on the outside of the frame 

to plumb the jamb. Confirm that the header is level across the opening. Repeat for the opposing 
jamb, loosely installing first the middle fastener, then the top and bottom. Return to the first jamb 
and install the remaining top and bottom fasteners loosely. 

4.  Starting with the top screws on both jambs, equally shim behind both jambs, leaving equal gaps and 

centering the package in the door opening. Tighten the top fasteners. Use your level on the inside of 
one jamb to determine shim requirements for the middle fastener, then shim and tighten. Repeat for 
the bottom fastener. Shim and tighten the middle and bottom fasteners on the other jamb in the same 
way. Check for jamb bowing with a straightedge and correct if present.

5.  Recheck the jambs, using a level on the outside and inside of each jamb, and the header. If the 

header and jambs are truly square, the top jamb to jamb and bottom jamb to jamb measurement 
should be identical. If necessary, strings can be taped from corner to corner on the outside of the 
jambs. The strings should cross in the center of the door opening, slightly touching each other. If 
there is a gap between the strings or the strings are pushing against each other, than the package is 
twisted and needs adjustment before proceeding.

Fig. 2

Содержание besam US23-0696-01

Страница 1: ...Solutions May not be reprinted or reproduced without permission Besam ICU CCU Equal or Unequal Panel Installation Adjustment and Troubleshooting Manual Complies with NFPA 101 Life Safety Code for Man...

Страница 2: ...d equipment damage Adjust doors for proper operation in accordance with manufacturer s instruction and adherence to NFPA 101 Life Safety Code and or AHJ Authority Having Jurisdiction In the following...

Страница 3: ...on Examples 12 Installation Requirements 13 Opening Closing and Locking of the cover 14 Site Inspection 15 Mechanical Installation 16 26 Checking Marking out Fastening 16 Leveling Header and Jambs 16...

Страница 4: ...ambs The header supports the sliding doors and sidelites Models Equal panel door packages can be bi parting 4 panel or single slide 2 panel left or right handed and sidelites may be installed fixed or...

Страница 5: ...Issue 7 23 2007 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Part Identification Options...

Страница 6: ...Issue 7 23 2007 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Part Identification Options...

Страница 7: ...ue 7 23 2007 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Part Identification Options Sidelite FSL Unequal Panel O...

Страница 8: ...7 23 2007 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Part Identification Options Active Leaf FSL Unequal Panel...

Страница 9: ...Issue 7 23 2007 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Part Identification Options Sidelite FBO...

Страница 10: ...Issue 7 23 2007 Besam ICU CCU Equal or Unequal Panel 10 Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Part Identification Options Active Leaf FBO...

Страница 11: ...Issue 7 23 2007 11 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Space Required...

Страница 12: ...Issue 7 23 2007 Besam ICU CCU Equal or Unequal Panel 12 Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Installation Examples...

Страница 13: ...2 min 2 50 mm from the underside Besam minimum recommended requirements Building Codes may give dif ferent specifications Thinner wall profiles must be reinforced with rivnuts Tools required Carpente...

Страница 14: ...d cover just above the weather stripping Rotate the wrench 90o toward the cover Feel for lip on the lock and slide about a 1 2 away from the jamb Gently pull up on the cover to ensure the lock has com...

Страница 15: ...or in the direction of break out should ideally be 90 or greater measuring from the highest point of the floor see below See Fig 1 The rough opening width should be 1 2 wider than the overall frame wi...

Страница 16: ...floor see Fig 1 page 15 if there is a slight rise in the floor at any point then the bottom of the jambs should be set level with the highest point of the floor with the header leveled across the ope...

Страница 17: ...line from jamb to jamb on the side where the track is being installed 3 Using the measurements provided see Fig 3 below lay the track in place While stand ing on the track and keeping it in line with...

Страница 18: ...glass stops or packing material from the sidelite before installation 1 Place sidelite on G track Line up the 2 connecting posts located approximately 6 from each end of the top horizontal with the 2...

Страница 19: ...e wheel brackets on top of the door onto the track inside the header 4 Install the anti risers by sliding the door past the anti riser block and lin ing up the carrier and block Insert anti riser bolt...

Страница 20: ...djustments to the break out ball catch 7 When all sidelite panels are installed tighten top pivot security set screw to pre vent depressing pivot pin 8 Install glass using proper glass blocking techni...

Страница 21: ...07 21 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Mechanical Installation Fig 5 Fig 6 Fig 7 Fig 8 Trackless Unequ...

Страница 22: ...sam ICU CCU Equal or Unequal Panel 22 Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Mechanical Installation Fig 9 FBO Sidelite Installation Trackless Su...

Страница 23: ...s into the track 3 Install the anti risers by sliding the door past the anti riser block and lin ing up the carrier and block Insert anti riser bolt and secure See Fig 11 Pg 25 4 Adjust the vertical a...

Страница 24: ...onto the track inside the header See Fig 14 6 Install the anti risers by sliding the door past the anti riser block and lin ing up the carrier and block Insert anti riser bolt and secure See Fig 11 Pg...

Страница 25: ...Issue 7 23 2007 25 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Mechanical Installation Fig 11 Fig 12 Anti Riser...

Страница 26: ...urer s instruction and adherence to NFPA 101 Life Safety Code and or AHJ Authority Having Jurisdiction Tension is not to exceed 50 lbs breakout force To adjust use a 1 2 wrench on the wrench flats to...

Страница 27: ...Issue 7 23 2007 27 Besam ICU CCU Equal or Unequal Panel Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Mechanical Installation Glazing and Blocking...

Страница 28: ...07 Besam Entrance Solutions May not be reprinted or reproduced without permission Copyright 2007 Besam Entrance Solutions May not be reprinted or reproduced without permission Besam Entrance Solutions...

Отзывы: