TESTING  FOR  LEAKS

1. Turn on the water supply and check for leaks.

2. Turn the power on at breaker/fuse box and test the

dishwasher operation by running a Rinse cycle.
(This should take about four minutes.)

3. Turn off the electrical power and check for leaks

In order to prevent heat damage to the inlet valve, all
solder connections must be made before the water
supply line is connected.

Flush the water supply line prior to connecting it to the
water fill tube.

The unit has a float switch in the base pan to protect
against flooding. If the inlet valve connection is not
seated properly, water may leak into the base pan and
activate the float switch.

It is important that the water supply line and the shut-off
valve have a sufficient flow volume. At last 3 gallons (12
liters) per minute must be able to pass through the
line. The water pressure should be 18-176 psi.

Be sure to run the PEX tubing through the hole
to sink compartment before moving the
dishwasher into position.

NOTE:

under the dishwasher and sink.

4. Make sure that no kinks have developed in the drain

lines.

If there are no leaks and the dishwasher seems to be
working properly, continue with the installation.

CONNECTING  THE  WATER  SUPPLY

(1)

Water supply

(2)

Water supply valve
(not supplied)

1.

Connect supply cable with
a UL-listed strain relief
bushing (if nonmetallic
cable is to be used).

2.

Connect branch circuit
white lead to lead on filter.

3.

Connect branch circuit
black lead to  L lead on filter.

WARNING!  

Before starting this procedure, be sure

the power is turned off at the breaker/fuse box.

CONNECTING  THE  ELECTRIC  CABLE

If the cord is not long enough, or if a hard-wire
installation is needed, follow the steps below to
complete the electrical connection.

4.

Connect ground wire to ground connection screw
on the bottom.

NOTE:

When doing a hard-wire installation, you must
remove the supplied power cord.

Содержание D3250FI

Страница 1: ...CE Introduction 2 What You Need 2 Dimensions 3 Preparing the Location 3 Water Supply 4 Drain Connections 5 Electrical Connections 6 Preparing the Dishwasher for Installation 6 Moving the Machine into Place 7 Connecting the Electric Cable 8 Connecting the Water Supply 8 Adjusting the Leveling Legs 8 Fastening the Dishwasher to the Cabinet 9 Installing the Toe Kick 9 Fitting the D3250 and D3530 Cust...

Страница 2: ...ng element 1200 W Max loading 1300 W Read these instructions carefully and completely before you install the machine The installation should be carried out by a qualified person who is familiar with all local codes and ordinances for electrical and plumbing connections If a dishwasher is being installed in this area for the first time most of the cabinet work plumbing and electrical has to be done...

Страница 3: ...ameter EUROPEAN INSTALLATIONS The kick plate supplied with your dishwasher fits a 24 610 mm opening When using European standard installation a 23 1 2 597 mm wide toe kick is available from your ASKO dealer Part numbers White 8073566 0 Black 8073566 86 For a 6 toe kick installation the part numbers are White 8073567 0 Black 8073567 86 PREPARING THE LOCATION CABINET OPENING US Metric Measurements M...

Страница 4: ...from the side wall so the door can open EASYINSTALL CONNECTIONS Drain hose boot Ready to be cut to desired drain connection Only one clamp required PEX tubing with 3 8 compression fitting PEX tubing has a 95 year spec life Fits American dishwasher water supply valves WATER SUPPLY 1 Water supply 2 Water supply valve not supplied In order to prevent heat damage to the inlet valve all solder connecti...

Страница 5: ...ght To eliminate potential drain problems simply leave this hose in place IMPORTANT THINGS TO REMEMBER Failure to provide the proper drain connection height minimum of 20 508 mm above the bottom of the dishwasher base or a 20 508 mm high loop will result in improper drainage which will damage the machine No part of the drain hose should be higher than 35 889 mm from the bottom of the dishwasher Th...

Страница 6: ...dishwasher wiring At this point the styrofoam plastic wrap and the wood pallet base should be removed from the dishwasher Now is an excellent time to inspect for any shipping damage Should you find any damage you should report it to your dealer or builder immediately Be sure to remove the toe kick and toe kick insulation which are wrapped in heavy brown paper and packed inside or on top of the dis...

Страница 7: ... the drain hose to ensure there are no sharp bends 4 Start to feed water and drain lines and electric cord if necessary into the access hole in the cabinet 5 Gently slide the unit into the dishwasher opening As you do this feed the drain line and inlet hose into the access hole in the side of the cabinet WARNING Be careful of sharp edges As you slide the unit into place feed the drain line and inl...

Страница 8: ...ater pressure should be 18 176 psi Be sure to run the PEX tubing through the hole to sink compartment before moving the dishwasher into position NOTE under the dishwasher and sink 4 Make sure that no kinks have developed in the drain lines If there are no leaks and the dishwasher seems to be working properly continue with the installation CONNECTING THE WATER SUPPLY 1 Water supply 2 Water supply v...

Страница 9: ... the back side of the toe kick making sure you don t cover any slots on the toe kick 4 Positioning the notches on the toe kick at the edge of the access panel slide the toe kick up behind the access panel then let it slide to the floor 5 Screw the toe kick to the toe kick brackets 6 Adjust the toe kick depth INSTALLING THE TOE KICK It s necessary to fasten the dishwasher to the cabinet so it won t...

Страница 10: ...in to install the panel Refer to the illustration at right for instruction references 1 Fit the handle A onto the panel according to the manufacturer s instructions NOTE A handle should be used rather than a knob because a knob does not provide enough grip 2 Loosen the screws D on the outer edges of the dishwasher door 3 Pull the turbo fan exhaust frame E down until the lower edge aligns with the ...

Страница 11: ...hich eliminates the need for a decorative fill strip D3250FI AND D3530FI CUSTOM PANEL INSTALLATION OPTIONS 6 inch Toe Kick Installations For 6 toe kick installations the decorative fill strips or support strips are unnecessary A stainless steel fill strip is also available for this type of installation part number 8073869 95 Panel extends from toe kick to cabinet top 4 inch toe kick 30 1 16 764 mm...

Страница 12: ...astening unit to cabinet 9 Fill strips 6 Fully integrated door panels 10 G Grounding instructions 6 H Heating element 2 High loop 5 Hot water supply 4 L Leaks testing for 8 Leveling legs adjusting 9 M Materials 2 Moving unit into place 7 P Panels fully integrated 11 Placing the unit 7 Power 2 S Slides for rear legs 6 T Technical data 2 Tip guards 2 installing 4 Toe kick installation options on FI ...

Отзывы: