For each use scenario, the corresponding set-up regulations must be respected. If used in explosion risk areas, the 
following conditions are to be respected for the individual finishes. 

2.2  Operator’s responsibility 

Safety instructions for proper operation of the device must be respected. They are to be provided by the operator for 
use by the respective personnel for installation, servicing, inspection and operation. Risks from electrical energy and 
from the released energy of the medium, from escaping media and from improper connection of the  device must be 
eliminated. The details for this are to be found in the corresponding applicable set of regulations, such as DIN EN, 
UVV (accident prevention regulations) and in sector-specific instances of use (DVWG, Ex-. GL,  etc.) the VDE 
guidelines and the regulations supplied by local utilities companies. 

The device must be taken out of service and secured against inadvertently being restarted, if the presumption is that 
risk-free operation is no longer possible (see Chapter 10: Faults). 

Conversion works or other technical alterations to the device by the customer are not permitted. This also applies to 
installation of spare parts. Possible conversations or alterations may only be carried out by the manufacturer. 

The operational safety of the device is only guaranteed where it is used for its intended purpose. The specification of 
the device must be adapted to the medium used in the plant. The limit values indicated in the technical data must not 
be exceeded. 

The safety information detailed in this Operating Manual, existing national regulations for accident prevention, and the 
operator’s internal regulations regarding working, operations and safety must be respected. 

The operator is responsible for all specified servicing, inspection and installation works being carried out by authorized 
and qualified specialists. 

2.3  Staff qualifications (target group assessment) 

The device may only be installed and started up by specialist staff who are familiar with installation, start-up and 
operation of the product. 

 

Specialist staff are people who are able to assess the work assigned to them on the basis of their specialist training, 
their knowledge and experience and their knowledge of the relevant standards, and can identify possible risks.  

For devices in explosion-protected configuration, these staff must have been trained or instructed in, or be authorized 
for, working on explosion-protected devices in potentially explosive plants.  

2.4  Signs/Safety markings 

The  switch  and its surrounding packaging carry markings. These markings show the article number, measurement 
range and manufacturer. The switches can be provided with additional signs and safety markings advising on special 
conditions: 

  Advice on calibration 

  Ex (for ATEX configuration)   

2.5  Safety equipment 

This device is fitted with safety locking devices and electrical earthing. The detecting element, when filled, secures the 
operating rod preventing removal and contains two venting holes that ensure that the interior of the enclosure is not 
subject to pressure greater than 2 lb/ft². 

2.6  Environmental protection 

This device contains electrical components. The provisions set out in the WEEE regulation  EU directive 2002/96/EC  
on electrical and electronically equipment are to be respected, and the products are registered at the EAR under the 
number DE 26646349.  

Содержание B7 series

Страница 1: ...del B7 differential pressure switch model D7 and temperature switch model T7 for explosion risk areas pursuant to Directive 94 9 EC ATEX IEC In the following configuration B7 CN pressure switch D7 CN...

Страница 2: ...ical data 7 5 Labeling on the device 7 5 1 Labeling on the device for explosion risk areas ATEX 7 6 Construction and function 7 6 1 Overview 7 6 2 Description of function 7 6 3 Description of componen...

Страница 3: ...19 11 Removal disposal 13 11 1 Safety 13 11 2 Removal 13 11 3 Disposal 14 12 Appendix 14 12 1 Data sheet for switches B7 D7 and T7 14 12 2 EG Declaration of Conformity 15 12 3 IECEX Declaration of con...

Страница 4: ...ality 1 4 Copyright This Operating Manual may only be copied and passed on as a complete document without the special permission of the publisher 1 5 Warranty For the product described here we offer a...

Страница 5: ...al regulations for accident prevention and the operator s internal regulations regarding working operations and safety must be respected The operator is responsible for all specified servicing inspect...

Страница 6: ...32 UNF 2B socket head cap screw The base houses a range of various switch elements and an operating rod The base has three bosses at 90 apart on its side walls The two opposing bosses each contain a N...

Страница 7: ...on and function 6 1 Overview B7 pressure switch D7 differential pressure switch T7 temperature switch Figure 1 6 2 Description of function The Ashcroft pressure switch is a precision built agency appr...

Страница 8: ...This is inherent in the design due to the precise relationship that exists between temperature and pressure according to the vapor pressure laws A wide selection of sensing bulb and armored capillary...

Страница 9: ...tection against special conditions such as vibrations pulsations and pressure spikes A bracket must be installed to support the switch if the metering pipe is not able to provide adequate support Ambi...

Страница 10: ...ust be frost protected Safety notice When tightening control to pressure line always use the wrench flats or hex on the lower housing and do not twist the device itself 8 3 2 Electrical connection Tak...

Страница 11: ...pressure As received the pressure switch will normally be set to approximately 90 of the indicated range Pressurize the system to required setpoint and turn the adjustment nut until switch changes mod...

Страница 12: ...a bath at the desired setpoint temperature Optimum performance will be obtained if the bulb is fully immersed Allow five minutes for initial stabilization As received the temperature switch will norma...

Страница 13: ...nance Never use aggressive solvents Do not use high pressure water to clean the switch 10 Faults 10 1 Safety Defective or faulty switches put the operational safety and process safety of the plant at...

Страница 14: ...pose of or recycle the devices and components used in accordance with the applicable regulations 12 Appendix 12 1 Data sheet for switches B7 D7 and T7 More detailed datasheets are available direct fro...

Страница 15: ...Page 15 of 19 12 2 EG Declaration of Conformity...

Страница 16: ...Page 16 of 19 12 3 IECEX Declaration of conformity...

Страница 17: ...Page 17 of 19...

Страница 18: ...Page 18 of 19...

Страница 19: ...Page 19 of 19...

Отзывы: