8.3  Mounting/Installation 

8.3.1  Process connection 

As standard, the device is equipped for pipework mounting with a pressure connection shank pursuant to DIN EN 837-
3. The device is calibrated ex works for vertical installation. 

 

Connection to be undertaken by authorized and qualified specialist staff only. 

 

Three holes external to the enclosure for surface mounting. Location of these holes is shown in the general 
dimension drawing. 

 

Units may also be mounted directly on the pressure line using the pressure connection. 

 

Use only with the mechanical process connection provided – regarding the configuration, see order code on the 
device type label, with a matching threaded seal. 

 

When connecting the device, the pipes must be depressurized. 

 

The pressure metering pipe must be laid inclined in such a way that, for example, for measurements of fluids no 
air pockets can form, and for measurements of gases no water pockets. If the necessary incline is not achieved, 
then at suitable points water separators or air separators must be installed. 

 

The pressure metering pipe  must  be kept as short as possible and laid without sharp bends, to avoid the 
occurrence of irritating delays. 

 

With liquid measurement media, the pressurized connection pipe must be degassed, since any gas bubble 
inclusions result in measurement error. 

 

If water is used as the measurement medium, the device must be frost-protected. 

 

Safety notice: When tightening control to pressure line, always use the wrench flats or hex on the lower 
housing, and do not twist the device itself. 

8.3.2  Electrical connection 

 

Take note of the electrical data in the EU design type test certification and the locally-applicable regulations 
and guidelines for installing and operating electrical plant in explosion risk areas (e.g. EN 60079-14, etc.). 

 

Connection to be undertaken by authorized and qualified specialist staff only. 

 

The electrical connection of the device is to be undertaken in accordance with the relevant regulations of the VDE 
and the regulations supplied by the local utilities company. 

 

Disconnect the plant from the mains supply before wiring electrical connections. 

 

Before operating the switch all conduit entries and/or junction boxes need to be closed according to the required 
safety and electrical codes. 

 

a) Standard product has two 3⁄4 NPT conduit holes with one permanent plug. 3⁄4 NPT conduit holes can be 

modified or reduced with ATEX approved adapters. 

 

b) Available ATEX approved cable glands can be used. 

 

It is recommended that Teflon tape or other sealant be used on conduit, bushing, gland or plug threads to ensure 
integrity of the enclosure. 

 

Cable couplers, glands and conduit connectors must have the correct electrical approvals. 

 

Always follow safety and electrical regulations when connecting these devices. 

 

The system ground of the device is marked with a green colored screw and/or by the ground symbol. 

 

ATEX approved switches have an external ground screw that must be connected.. 

Содержание B7 series

Страница 1: ...del B7 differential pressure switch model D7 and temperature switch model T7 for explosion risk areas pursuant to Directive 94 9 EC ATEX IEC In the following configuration B7 CN pressure switch D7 CN...

Страница 2: ...ical data 7 5 Labeling on the device 7 5 1 Labeling on the device for explosion risk areas ATEX 7 6 Construction and function 7 6 1 Overview 7 6 2 Description of function 7 6 3 Description of componen...

Страница 3: ...19 11 Removal disposal 13 11 1 Safety 13 11 2 Removal 13 11 3 Disposal 14 12 Appendix 14 12 1 Data sheet for switches B7 D7 and T7 14 12 2 EG Declaration of Conformity 15 12 3 IECEX Declaration of con...

Страница 4: ...ality 1 4 Copyright This Operating Manual may only be copied and passed on as a complete document without the special permission of the publisher 1 5 Warranty For the product described here we offer a...

Страница 5: ...al regulations for accident prevention and the operator s internal regulations regarding working operations and safety must be respected The operator is responsible for all specified servicing inspect...

Страница 6: ...32 UNF 2B socket head cap screw The base houses a range of various switch elements and an operating rod The base has three bosses at 90 apart on its side walls The two opposing bosses each contain a N...

Страница 7: ...on and function 6 1 Overview B7 pressure switch D7 differential pressure switch T7 temperature switch Figure 1 6 2 Description of function The Ashcroft pressure switch is a precision built agency appr...

Страница 8: ...This is inherent in the design due to the precise relationship that exists between temperature and pressure according to the vapor pressure laws A wide selection of sensing bulb and armored capillary...

Страница 9: ...tection against special conditions such as vibrations pulsations and pressure spikes A bracket must be installed to support the switch if the metering pipe is not able to provide adequate support Ambi...

Страница 10: ...ust be frost protected Safety notice When tightening control to pressure line always use the wrench flats or hex on the lower housing and do not twist the device itself 8 3 2 Electrical connection Tak...

Страница 11: ...pressure As received the pressure switch will normally be set to approximately 90 of the indicated range Pressurize the system to required setpoint and turn the adjustment nut until switch changes mod...

Страница 12: ...a bath at the desired setpoint temperature Optimum performance will be obtained if the bulb is fully immersed Allow five minutes for initial stabilization As received the temperature switch will norma...

Страница 13: ...nance Never use aggressive solvents Do not use high pressure water to clean the switch 10 Faults 10 1 Safety Defective or faulty switches put the operational safety and process safety of the plant at...

Страница 14: ...pose of or recycle the devices and components used in accordance with the applicable regulations 12 Appendix 12 1 Data sheet for switches B7 D7 and T7 More detailed datasheets are available direct fro...

Страница 15: ...Page 15 of 19 12 2 EG Declaration of Conformity...

Страница 16: ...Page 16 of 19 12 3 IECEX Declaration of conformity...

Страница 17: ...Page 17 of 19...

Страница 18: ...Page 18 of 19...

Страница 19: ...Page 19 of 19...

Отзывы: