AC25/30Q-1 and -3 Operations Manual....
18
5.2 ELECTRICAL
INSTALLATION
This procedure assumes the physical installation of the converter has been completed.
It is the installer’s responsibility to provide input service over-current protection and a
disconnect means.
It is recommended that connection be made to the distribution bus through a manually operated
disconnect device such as a molded case switch or circuit breaker (rated for the total system
amperage) to ease disconnection and provide a safe servicing environment in the event of
converter failure.
Follow the table below for shore power wiring.
MAXIMUM INPUT CURRENTS UNDER LOW-LINE CONDITIONS:
Model
AC25Q-1,
-3
AC30-1, -3
Input Current
Single
Phase,
170-290V
140A
165A
Single
Phase,
330-520V
76A
91A
Three
Phase,
170-290V
93A
112A
Three
Phase,
330-520V
51A
61A
MAXIMUM OUTPUT CURRENTS:
Refer to Table 1, page 11
All power wiring requires the removal of the front panel and the power cable access cover
(cabinet bottom). This cover is secured with 2 ea 1/4-20" x ½" stainless steel screws. Drill or
punch the appropriate holes for the selected strain reliefs. Re-install the input service panel using
the removed hardware. Place the disconnect switch in the OFF position.
Содержание AC25Q-1
Страница 16: ...AC25 30Q 1 and 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE...