AC25/30Q-1 and -3 Operations Manual....
19
5.2
ELECTRICAL INSTALLATION, cont.
INPUT WIRING MUST BE PERFORMED BY A QUALIFIED ELECTRICIAN
FAMILIAR WITH STANDARD SAFEGUARDS AND PROCEDURES
REQUIRED BY THE INSTALLATION OF THIS TYPE OF EQUIPMENT.
POWER MUST BE REMOVED FROM THE INPUT DISTRIBUTION SYSTEMS
SUPPLYING POWER TO THE AC25/30Q-1, -3 PRIOR TO THE START OF THE
FOLLOWING STEPS. INPUT POWER MUST BE SECURED (LOCKED) IN
THE OFF (DE-ENERGIZED) STATE UNTIL INSTRUCTED OTHERWISE BY
THIS DOCUMENT. ALSO SECURE IN THE OFF STATE ANY CIRCUIT
BREAKER(S) IN THE SWITCHGEAR PANEL THAT MAY BE SUPPLYING
SHIP’S BUS POWER TO THE CONVERTER OUTPUT TERMINAL BLOCK.
FAILURE TO FOLLOW THESE PROCEDURES CAN RESULT IN DAMAGE
TO THE EQUIPMENT, AND CAN PRESENT THE RISK OF INJURY OR
DEATH TO THE INSTALLER OR THE OPERATOR.
Содержание AC25Q-1
Страница 16: ...AC25 30Q 1 and 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE...
Страница 17: ...AC25 30Q 1 and 3 Operations Manual 17 5 1 MECHANICAL INSTALLATION cont FIGURE 3 CONTROLS...
Страница 55: ...AC25 30Q 1 and 3 Operations Manual 55 FIGURE 9 STATUS WORD BIT DEFINITIONS...