7.3
LOAD MANAGEMENT OPERATION, cont.
7.3.5 Quick Setup of Shore Cord Alarm
, Single, Master, or Slave Converters
1. Turn on the red Disconnect switch of both converters and wait 15-20 seconds for initialization.
2. Press the
SHORE POWER
+
F2
buttons on both converters.
3. Press the Cursor (
F4
) button to advance to the ALARM AT % setting.
4. Set the converter ALARM AT % using the More/Less (
F1
/
F2
) buttons.
5. Press the Cursor (
F4
) button to advance to the ALARM enable setting.
6. Set the converter ALARM enable using the Enable/Disable (
F1
/
F2
) buttons.
7. Press the Exit (
F5
) button to save the settings and exit.
8. Turn on the converters and place online as usual. Alarm will occur when loading reaches the
ALARM AT % setting.
Содержание AC25Q-1
Страница 16: ...AC25 30Q 1 and 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE...
Страница 17: ...AC25 30Q 1 and 3 Operations Manual 17 5 1 MECHANICAL INSTALLATION cont FIGURE 3 CONTROLS...
Страница 55: ...AC25 30Q 1 and 3 Operations Manual 55 FIGURE 9 STATUS WORD BIT DEFINITIONS...