
AC100Q-3 Operations Manual....
59
10
MAINTENANCE
Due to the design and construction of the converter, preventative maintenance is held to a modest
level. The following table lists minimum recommended tasks and frequency.
TASK
FREQUENCY
COMMENTS
Tighten
electrical
connections
Every 6 months
Must be adjusted by the user based upon
experience
in
the
environment.
Frequency will vary due to wire gauge,
wire type, and applied vibration.
Refer to an authorized service center
.
Calibration
Every year
Calibration
required
after
battery
replacement. Lack of calibration may
result in a 3-5% decrease in metering and
voltage programming accuracy.
Refer to an authorized service center
.
CPU Battery replacement.
Every 3 years
May require greater frequency with
elevated ambient temperature, or extended
periods of non-operation.
Refer to an authorized service center
.
Содержание AC100Q-3
Страница 15: ...AC100Q 3 Operations Manual 15 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE ...
Страница 16: ...AC100Q 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 3 MECHANICAL OUTLINE ...
Страница 38: ...AC100Q 3 Operations Manual 38 This page intentionally left blank ...
Страница 55: ...AC100Q 3 Operations Manual 55 FIGURE 8 STATUS WORD BIT DEFINITIONS ...