AC100Q-3 Operations Manual....
14
5.1
MECHANICAL INSTALLATION
The converters were designed for deck mount installations and as such are provided with eight
mounting holes. Mounting holes have been provided with 0.56” (14.2mm) diameters; ½”
(13mm) stainless steel hardware is required.
The mounting surface should be flat and dimensionally stable to within 1/16” (1.5mm) to prevent
torsional stresses being applied to the structure of the converter. Spacers (shim stock) may be
added between the mounting surface and the converter mounting flanges to adjust the mounting
plane. If the system is to be mounted in a high vibration/shock environment, then the factory
must be consulted concerning the application. Drawings for approved shock mounting
assemblies will be supplied.
The following recommended clearances must be considered during installation for proper
operation:
TABLE 2
FOR PROPER:
Operation
Service
Front
24” (Exhaust Airflow)
24” min
Sides
0”
6”
Top
0”
6”
Rear
5” (Intake Airflow)
0”
Air intake grillwork is provided at the rear of the equipment. Please contact factory engineers for
review of the installation plan if unsure on any specification or requirement.
Содержание AC100Q-3
Страница 15: ...AC100Q 3 Operations Manual 15 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE ...
Страница 16: ...AC100Q 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 3 MECHANICAL OUTLINE ...
Страница 38: ...AC100Q 3 Operations Manual 38 This page intentionally left blank ...
Страница 55: ...AC100Q 3 Operations Manual 55 FIGURE 8 STATUS WORD BIT DEFINITIONS ...