5
INSTALLATION
The installation section is divided into two parts. The first will cover mechanical installation, the
second, electrical installation.
Read this manual thoroughly prior to attempting the installation. Improper installation is the most
significant cause of system start-up problems and service issues over the product’s life. Upon
receipt of the equipment, perform an external visual inspection. Verify that nameplate
information is consistent with the ship’s power requirements (required form, voltage, and
frequency).
Proper planning will speed up installation, location, and connection of the equipment. Follow the
suggested minimum clearances provided in Table 2.
Ensure the room/compartment has
adequate ventilation and cooling. The thermal load presented by the converter will be
substantial, approximately 21,850BTU/Hr at maximum continuous load for the AC100Q-3.
THE CONVERTER IS HEAVY, WEIGHING 1,583lbs. (718kg) EXTREME CAUTION
MUST BE EXERCISED IN HANDLING AND INSTALLATION TO AVOID
EQUIPMENT DAMAGE OR INJURY TO PERSONNEL. AN ADEQUATE MATERIAL
HANDLING DEVICE SHOULD BE USED FOR UNLOADING, MOVING, AND
POSITIONING THE SYSTEM.
Содержание AC100Q-3
Страница 15: ...AC100Q 3 Operations Manual 15 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE ...
Страница 16: ...AC100Q 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 3 MECHANICAL OUTLINE ...
Страница 38: ...AC100Q 3 Operations Manual 38 This page intentionally left blank ...
Страница 55: ...AC100Q 3 Operations Manual 55 FIGURE 8 STATUS WORD BIT DEFINITIONS ...