Reference) CIP (EFM method) Timing Chart (* Valve open/close duration excluded)
EFM Process
480 min (8 hrs) at a time
Process
AS/BW Drain
Chemical
Supply
Drain
Rinse
(BW/FL)
AS/BW FL Drain
Chemical
Supply
Drain
Rinse
(BW/FL)
AS/BW
FL
Duration (min)
1
2
360
2
5
1
1
2
97
2
5
1
1
AV-1
Raw water feed
valve
AV-2
Filtrate valve
AV-3
Backwash valve
AV-4
Return valve
AV-5
AS/BW drain
valve
AV-6
Drain valve
AV-7
Air supply valve
AV-8
Chemical supply
valve
AV-9
Return valve on
chemical drain
side
AV-10
Return valve for
chemical drain on
permeate side
P-1
Filtration pump
P-2
Backwash Pump
P-3
Chemical pump
P-4
Sodium
hypochlorite
injection pump
Air compressor
Turns on and off in accordance with pressure settings
* The processes and durations shown here are typical examples. What processes and durations to employ depends on the system. Be sure to
employ appropriate processes and durations for your system.
ON or Valve opens
OFF or Valve closes