41
4
1) Attach a gasket to the discharge
nozzle of the module. Align the
nozzle with the discharge pipe
and fasten the cap nut.
2) Connect the discharge nozzle to
the discharge pipe of the rack.
Note:
Ensure that the gasket is not
misaligned.
5
1) Loosen the expansion joint nut on
the permeate side, insert the
expansion joint onto a permeate
pipe of the rack, and lightly tighten
the nut so that the expansion joint
does not fall.
2) Set the module in place, loosen
the expansion joint nuts, slide the
entire joint downward onto the
End cap B nozzle, and lightly
tighten the nuts.
Note
Ensure that the permeate pipe
and the End cap B nozzle are
sufficiently
inserted
into
the
expansion joint.
Leave a clearance of 30 to 50
mm between the nozzle end and
the permeate pipe end.
If the cap nozzle and the
permeate pipe are not sufficiently
inserted, leakage may occur from
the nut sections.
Cap Nut
30 - 50 mm