ELECTRIC WIRE LIFT
21
In case some gaps at the mast connection, adjust
the slide fixing plate.
① Loosen the hex nut.
② Tighten the stop bolt.
③ Loosen the stop bolt by 90°and adjust the gap.
④ Tighten the hex nut to fix.
⑤ Check if the mast moves smoothly.
⑥ If the mast does not down, loosen the stop bolt more by 45°and adjust the gap.
① Storage condition
② Store the unit in a flat place.
Do not put a heavy object on the unit. In case put something on the unit, put
the unit into the carton box and follow the instruction on the carton box.
③ Store the unit where no vibration and risk for damage.
④ Store the standard accessories with the unit.
⑤ Restriction on storage period
Do not store the unit in an inappropriate condition.
Do not leave for over 3 months to prevent the unit from getting rust on the
metallic parts or causing any other defect on the parts even though in an
appropriate condition.
How to Adjust Slide Fixing Plate
Storage
Slide Fix Plate
Hex Nut
Stop Bolt
Storage temperature -5℃ ~ 45℃
Humidity
Less than 90%(no condensation)
Storage place
Indoor