CCS-IP2 CALL STATION
User Manual
armtel.com
page 29/52
© Armtel
2.4 Installation, connection and dismantling
Safety precautions given in 2.2 must be observed during installation, connection and
dismantling of the product.
2.4.1 Installation
Metal brackets from the supply package should be mounted at the rear side of the
enclosure to install the CCS-IP2 at the workstation.
Before installing the product, carry out marking according to
Figure 6 (a, b). The height at which the CCS-IP2 is mounted on the wall recommended be
such that the microphone is at the mouth level of an average-sized human, i.e.
1500–1600 mm from the floor level.
а) mounting on the brackets from the supply package
Figure 6 – Installation of CCS-IP2 (beginning)