North America • Latin America • India • Europe / Middle East / Africa • China • Pacific Rim
armstrong
international.com
Designs, materials, weights and performance ratings are approximate and subject to change without notice. Visit
armstrong
international.com for up-to-date information.
29
Commissioning
Inspecting Installation
Inspecting Water System
1. Confirm all checks in start-up checklist above.
2. Check all field connections in control panels.
3. Identify any additional wiring in panels.
4. Confirm rotation of blower and pump motors.
5. Confirm what fuel is supplied and note label on fuel train.
1. Run cold water first to prevent damage in lower canister.
2. Press "MANUAL START".
3. Set water inlet pressure to about 20 psi.
4. Visually confirm proper flow.
5. Check for leaks.
6. Confirm adequate pressure.
7. Confirm pump operation.
8. Close water valve.
9. Set main water valve to normal operation.