21
Pictures for illustrating purposes only
SERIES EHU-750 HUMIDIFIER
Installation - Step 3
Room ventilation unit
Width
Heigth
Depth
Weight
Kg
dB
maxi
output
Kg/h
m3/h
Steam connecting
Ø in mm
BP1
260mm
170mm
285mm
2
40
5
53
Ø 25
BP2
260mm
170mm
285mm
2.6
48
15
320
Ø 40
EHFIII
495mm
356mm
406mm
15
48
50
780
Ø 50
1m mini
EHF III
BP 1 & BP2
Dimensions & characteristics
Three ventilation packs permit the use of the humidifier in direct in-space
applications where there is no ductworks :
Blower Pack BP 1 = for capacities up to 5 kg/h
Blower Pack BP 2 = for capacities up to 15kg/h
EHF III = for capacities up to 50 kg/h
The EHFIII ventilation packs cannot be set on the top of the humidifier (see
after attached pictures). The distance between the humidifier and the ven-
tilation pack(s) should not exceed 3 m.
A Ø25mm or Ø40mm direct connection from the humidifier to the blower
pack BP1 or BP2. Two blower packs can be installed equally distant (X).
(X1=X2). The connection from the humidifier to the EHF III blower pack is
made via a Ø 40/50 mm adaptor.
For use and installation of the Blower Pack ventilation units, please
refer to our Blower Pack technical manual avaliable in English
.
The electrical connection of the ventilation packs to the humidifier is via
terminal block 3 & 4 on the DIN rail.
As far as the EHF-3 is concerned, please revert to the recommenda-
tions given on the EHF-3 information sheet. Never connect the EHF-3
unit on the terminals 3 & 4 of the humidifier when a 100VA transfor-
mer is installed inside the EHU-750.
Allow a 3 m. distance ahead to the ventilation pack for a free diffusion of
steam.
0,50m mini
Examples of installation
Take care :
Attach hose on wall before
connecting it to Blower Pack.
Drain
Drain