TWOJE ŹRÓDŁO ENERGII
|
38
INSTRUKCJA OBSŁUGI
/ MANUAL
MODUŁY BATERYJNE
/ BATTERY PACK
PL
EN
2)
Mount rail kits (each for every UPS and BP module) inside the 19" Rack cabinet. Before attaching
them, make sure that each rail is at an equal height to the other rail from the same kit. Then, using
the M6 mounting cage nuts, tighten these additional mounting elements to the vertical mounting
rails, inside the 19" Rack cabinet.
3)
Slide the UPS and Battery Pack modules into horizontal rails and position them so that the holes on
the rails align with those on Armac devices.