TWOJE ŹRÓDŁO ENERGII
|
33
INSTRUKCJA OBSŁUGI
/ MANUAL
MODUŁY BATERYJNE
/ BATTERY PACK
PL
EN
Installation with the use of mounting ears.
1)
Align the mounting ears with the screw holes on both sides of both Armac UPS and Battery Pack.
Then tighten the screws firmly.
2)
Place the UPS and Battery Pack at the selected height, making sure that the mounting ears are at an
even height with respect to the vertical mounting rail kits. Then slide the UPS and BP into the 19”
server cabinet and tighten 2 M6 mounting screws to the previously installed 2 M6 cage nuts, on
each side of the UPS and Battery Pack module.