13
When all the cables are connected,
the control box should look like the
picture on the left.
Make sure the cables lie flat and
are not twisted.
14
Replace the control box cover by
sliding it into position until it “clicks”
into place.
The cables enter the control box
through a slot on the right side of
the cover, next to the cord grip.
Make sure that none of the cables
is trapped or pinched.
15
•
Check that the six socket head screws holding the bed sections
together are fully tightened.
•
Carefully turn the bed upright onto its castors.
•
Remove the plastic ties used to secure the backrest and leg sections to
the bed frame during transit.
•
Connect the power plug to a suitable outlet socket.
•
Refer to Chapter 4 Operation. Check that all the bed’s electrical
functions operate satisfactorily over their full range of movement. Make
sure that no cables become stretched or trapped in the bed mechanism
during operation.
•
Install the mattress retainers on the backrest and leg sections – refer to
Chapter 5 Accessories – Fitting and Operation for fitting instructions.
•
Install a suitable, compatible mattress on the bed.
The bed is now ready for use. Read the following Chapters for guidance
on using the bed and the optional accessories.
746-574-AM-1
19