background image

Mattresses and side 
rails

 

When choosing bed and mattress combinations, it is 
important to consider the use of side rails (where fitted) 
based on clinical assessment of each individual patient and 
in line with local policy. 

When assessing the suitability of a mattress for use with side 
rails, the following factors should be considered: 

  If the bed is installed with standard side rails, a foam 

mattress up to 5.9in.(15cm) thick can be used. 

  If the bed is installed with extra-height side rails, a foam 

mattress up to 6.8in. (17.2cm) thick can be used. 

  Specialist powered air / foam replacement mattresses will 

typically envelop the patient when loaded and can 
generally be deeper than a foam mattress without 
compromising safety. Other makes of specialist mattress 
replacement must be assessed individually prior to use to 
verify sufficient clearance is maintained. 

  Only use a mattress overlay when combined with Full 

Length Standard Height Wooden Side rails(CM-ACC00-
1.52, CM-ACC00-3.52 or CM-ACC01-1.52) and Side Rail 
Height Extensions CM-ACC02-1.52 or CM-ACC02-
3.52(see page 29). With this combination the bed can be 
fitted with a mattress up to 5.9in.(15cm) and an overlay 
between 4.3in.(11cm) and 4.5in.(11.5cm). 

  To ensure compliance with EN 60601-2-52, an approved 

ArjoHuntleigh mattress should be used. Compliance with 
this standard when using other mattresses must be 
validated by the user. 

For more information on suitable mattresses and mattress 
replacements, contact your local ArjoHuntleigh office or 
approved distributor. A list of ArjoHuntleigh offices can be 
found at the back of this manual. 

 

746-574-AM-1 

 

13 

Содержание Minuet 2 160

Страница 1: ...MINUET 2 INSTRUCTIONS FOR USE with people in mind 746 574 AM 1 10 2015...

Страница 2: ...of companies ArjoHuntleigh 2004 As our policy is one of continuous development we reserve the right to modify designs without prior notice The content of this publication may not be copied either who...

Страница 3: ...peration 25 Full length side rails 27 Side rail height extensions 29 Folding steel side rails 31 Pads for full length side rails CM ACC03 CM ACC26 34 Lifting poles CM ACC09 35 Mobility support handle...

Страница 4: ...ult in death injury or other serious adverse reactions Cautions given in this manual identify possible hazards in procedures or conditions which if not correctly followed could result in equipment dam...

Страница 5: ...use with the bed Do not connect the bed to other equipment unless specified in these instructions This product contains small parts that may present a choking hazard to children if inhaled or swallowe...

Страница 6: ...th the requirements of applicable standards for electromagnetic compatibility EMC However medical electrical equipment requires special precautions regarding EMC and should be installed and used in ac...

Страница 7: ...es not meet the requirements of the Trendelenburg position The bed cannot be used in applications that need the patient to be put in the Trendelenburg position The model number and serial number can b...

Страница 8: ...ontrol handset 3 Seat section 11 Thigh upper leg section 4 Control box backup battery 12 Leg section actuator 5 Backrest actuator 13 Leg section ratchet 6 Backrest section 14 Foot end actuator 7 Head...

Страница 9: ...te for situations where assistance is required in positioning the patient or in reducing lifting and manual handling stresses on the carer The profiling mattress platform allows the patient to be supp...

Страница 10: ...ent care Model 161 is not suitable for use in the following situations Intensive critical care provided in a hospital where 24 hour medical supervision and constant monitoring is required e g ITU ICU...

Страница 11: ...luding attached loads 33lb 15kg TOTAL 396lb 180kg WARNING If the combined weight of the mattress and accessories exceeds 77lb 35kg the maximum patient weight must be reduced accordingly The recommende...

Страница 12: ...result in the screws not being fully tightened The foot end and head end panels are almost identical The foot end panel can be identified by the ArjoHuntleigh and Minuet 2 badges attached to it The v...

Страница 13: ...CC00 3 52 Full Length Standard Height Wooden Side Rails Brown Beech 5 9in 15cm CM ACC01 1 52 Full Length Standard Height Wooden Side Rails Grey Cherry 5 9in 15cm CM ACC00 1 14 Full Length Extra Height...

Страница 14: ...mpromising safety Other makes of specialist mattress replacement must be assessed individually prior to use to verify sufficient clearance is maintained Only use a mattress overlay when combined with...

Страница 15: ...before the head end section 2 Remove the two socket head screws B from one of the transit brackets A Remove the second transit bracket taking care not to allow the end panel sections to fall Keep the...

Страница 16: ...ad end panel assembly Place socket head screws into the two holes D on the underside of the head end mattress platform and fix the sections together installing the bottom screw first Tighten both scre...

Страница 17: ...e sections together installing the bottom screw first Tighten both screws firmly 6 Assemble the foot end panel to the bed lining up the fixing holes in the arms with the fixing holes H in the foot end...

Страница 18: ...he connector being accidentally pulled out of the actuator Connect the foot end actuator cable in the same way 8 The control box is located below the seat section on the patient s right hand side Push...

Страница 19: ...le green into the control box Plug the leg section actuator cable yellow into the control box 11 Plug the control handset cable into the remaining socket Make sure that all the plugs connected to the...

Страница 20: ...onto its castors Remove the plastic ties used to secure the backrest and leg sections to the bed frame during transit Connect the power plug to a suitable outlet socket Refer to Chapter 4 Operation Ch...

Страница 21: ...eously to achieve a comfortable sitting position Bed height adjusts the height of the mattress platform above the floor Backrest adjusts the angle of the backrest section Leg elevation adjusts the ang...

Страница 22: ...k a function press and hold the button to the right of the LED for three seconds the LED turns on To store the lockout settings remove the key from the handset WARNING Always remove the key before all...

Страница 23: ...he brakes on all four castors whenever the patient is moved to or from the bed To apply the brake Press down on the brake operating lever A until it locks in the down position To release the brake Pus...

Страница 24: ...he thigh section to the desired height Lift the mattress retaining bar A upwards to release the ratchet mechanism then lower it to the required angle Slightly lift the mattress retaining bar again to...

Страница 25: ...o secure the foot end panel in the extended position Make sure both screws are fully tightened Squeeze the split ends of the two retaining pins C and push them up and out of the holes Pull the mattres...

Страница 26: ...ight Extension for Full Length Standard Height Wooden Side Rails grey CM ACC02 3 52 Height Extension for Full Length Standard Height Wooden Side Rails brown CM ACC03 Pads for Full Length Side Rails CM...

Страница 27: ...o 6 8in 17 2cm thick Side Rail Height Extension and Full Length Standard Height Wooden Side Rails can be used with a mattress and mattress overlay up to 10 4in 26 5cm thick The clinically qualified pe...

Страница 28: ...in the same way Extra height side rails should be used when the mattress thickness is between 5 9in 15cm and 6 8in 17 2cm Refer to page 12 Full length side rails are supplied as identical pairs They c...

Страница 29: ...rail end pillar Lower the side rail to its bottom position Repeat this procedure at the head end of the bed To raise the side rail Hold the plastic moulding C at the foot end of the bed and pull the t...

Страница 30: ...kness from 4 3in 11cm to 4 5in 11 5cm CM ACC02 1 52 and CM ACC02 3 52 are for use with full length standard height wooden side rails CM ACC00 1 52 CM ACC00 3 52 or CM ACC01 1 52 The side rail height e...

Страница 31: ...e fixing clamp Do not tighten the screw fully at this stage Repeat this procedure for both fixing clamps Slide the height extension assembly along the side rail top rail until the distance D between t...

Страница 32: ...the bed as viewed from the head end These illustrations show the left hand side rail Installation Position the side rail assembly on the side frame of the bed with the two fixing brackets hooked over...

Страница 33: ...of the bed frame Secure the foot end clamp D in the same way WARNING Make sure the screw clamps are fully tightened Repeat this procedure to attach the other folding side rail on the opposite side of...

Страница 34: ...ping your hand clear of the hinge point E Pull the rail upwards until the side rail locks in the raised position The side rail release knob contains a yellow band G If the yellow band is visible it me...

Страница 35: ...o release the flap B Position the side rail pad C on the bed It should be placed between the mattress and the side rail with the flap on the outside of the side rail top rail or the outside of the hei...

Страница 36: ...e manufacturer s instructions After this time the complete unit should be replaced Inspect the strap and handle regularly If any sign of wear or damage is found remove it from use immediately and repl...

Страница 37: ...al part of the pole is positioned above the center of the bed Place the loop of the lifting strap D over the horizontal part of the pole Make sure the loop lies between the two pegs circled on the lif...

Страница 38: ...strap and handle in a pressure chamber autoclave or steam cleaner as this may damage the product Before cleaning the handle extend the strap fully and leave it extended until the handle is completely...

Страница 39: ...support handle into the accessory socket A on the appropriate side of the bed Make sure the mobility support handle cannot rotate in the socket When correctly installed the square base of the pole B s...

Страница 40: ...not hang other objects on the mobility support handle Always install the mobility support handle on the correct side of the bed Do not apply polish or other liquids to the handle as this may make it m...

Страница 41: ...ically downwards into one of the two accessory sockets A at the head end of the bed Twist the pole until you feel it drop slightly in the socket Make sure the IV pole cannot rotate in the socket WARNI...

Страница 42: ...lation Hang the bracket A over the foot end panel with the pump holder on the outside of the bed Operation Install the mattress pump on the pump bracket Refer to the instructions for use provided with...

Страница 43: ...uired Installation Position the arms A of the urine bag holder over the outer frame of the bed see illustration When installing the urine bag holder make sure the bag supporting lugs B are on the outs...

Страница 44: ...een 5 9in 15cm and 6 8in 17 2cm Refer to page 12 Egress assist rails are supplied as a matching pair to suit the right and left hand sides of the bed these instructions show an egress assist rail on t...

Страница 45: ...e bed Hook the fixing bracket over the top of the bed frame The spacer bar B must fit behind the edge of the head end panel A as shown This will make sure the Egress Assist Rail is correctly positione...

Страница 46: ...rail on the bend F Pull out and hold the release knob E Rotate the Egress Assist Rail towards the head end of the bed until it locks in position WARNING Take care not to trap the patient s limbs when...

Страница 47: ...e floor Ensure the Egress Assist Rail is locked in the raised position The patient can hold the rail H and use it to help them into a standing position J WARNING Do not use the Egress Assist Rails to...

Страница 48: ...sections They should be positioned on the side frame between the mattress platform bars with the flaps angled towards the outside of the bed The diagram shows the correct positions for the mattress r...

Страница 49: ...t it to one side Unplug the foot end actuator cable green from the control box Unplug the leg section actuator cable yellow from the control box Do not unplug the backrest red head end white or batter...

Страница 50: ...nel section A on its side Position the foot end panel B section also on its side so that both fixing arms overlap as shown in the diagram Place the transit brackets C down over the fixing arms Both tr...

Страница 51: ...ing block H between the two mattress platform sections Fasten a plastic cable tie J around the packing block and mattress platform sections to hold them together Check that no cables are trapped betwe...

Страница 52: ...ons of the bed and clean the castors last Take extra care with areas that may trap dust or dirt Rinse with clean water and dry with disposable paper towels Allow the cleaned parts to dry completely be...

Страница 53: ...ricity supply before starting any maintenance activity To isolate the bed from the electricity supply disconnect the electrical power cable from the socket outlet The bed will still operate on battery...

Страница 54: ...present and correctly tightened Check all bed accessories paying particular attention to fasteners and moving parts Battery test Check the condition of the backup battery by carrying out the following...

Страница 55: ...ion None of the actuators work Power cord disconnected Check the power cord is plugged in and the electricity supply is OK Fuse blown Check fuse in the power plug where fitted Control handset disconne...

Страница 56: ...nuet 2 can be found in the Service Manual part number 746 575 available from your local ArjoHuntleigh sales office ArjoHuntleigh will make available on request service manuals component parts lists an...

Страница 57: ...ithout mattress or accessories Head and foot end panel sections 50lb 22 8kg each Head end mattress platform section 52lb 23 5kg Foot end mattress platform section 44lb 19 8kg Total 196lb 88 9kg Dimens...

Страница 58: ...harmful effect Environmental protection This product is marked with the crossed out wheelie bin symbol to indicate that it is covered by EU Directive 2002 96 EC on Waste Electrical and Electronic Equi...

Страница 59: ...cal Devices Directive 93 42 EEC Safe working load SWL Maximum recommended patient weight Recommended mattress size displayed on bed Recommended mattress size displayed on accessory Refer to instructio...

Страница 60: ...tomer or the user of the bed should assure that it is used in such an environment Emissions test Compliance Electromagnetic environment guidance RF emissions CISPR 11 Group 1 The bed uses RF energy on...

Страница 61: ...r supply quality should be that of a typical commercial or hospital environment 2kV line to earth 2kV Voltage dips short interruptions and voltage variations on power supply input lines IEC 61000 4 11...

Страница 62: ...ctromagnetic site survey a should be less than the compliance level in each frequency range b Interference may occur in the vicinity of equipment marked with the following symbol NOTE 1 At 80MHz and 8...

Страница 63: ...n distance according to frequency of transmitter m 150kHz to 80MHz 80MHz to 800MHz 800MHz to 2 5GHz d P 1 2 d P 1 2 d P 2 3 0 01 0 12 0 12 0 23 0 1 0 38 0 38 0 73 1 1 2 1 2 2 3 10 3 8 3 8 7 3 100 12 1...

Страница 64: ...This Page Intentionally Left Blank 746 574 AM 1 63...

Страница 65: ...This Page Intentionally Left Blank 746 574 AM 1 64...

Страница 66: ...This Page Intentionally Left Blank 746 574 AM 1 65...

Страница 67: ...2 745 800 Fax 44 0 1582 745 866 E mail international arjohuntleigh com ITALIA ArjoHuntleigh S p A Via Giacomo Peroni 400 402 IT 00131 ROMA Tel 39 0 6 87426211 Fax 39 0 6 87426222 E mail Italy promo ar...

Страница 68: ...oHuntleigh GETINGE and MAQUET ArjoHuntleigh focuses on patient mobility and wound management solutions GETINGE provides solutions for infection control within healthcare and contamination prevention w...

Отзывы: