17
Citadel Patient Therapy System
Testing
Prior to patient placement, the following test procedures should be performed
to make sure air mattress control unit and air mattress installation are
complete:
1. Plug the power cord into power outlet.
2. Turn the air mattress control unit on by pressing and holding the
mattress section LEDs on the control unit panel will blink whilst the
blinking.
3.
CPR valves are closed. Check for a leak at the mattress to frame
connection point. Refer to Attach Integrated Air Mattress Section,
4. At one of the bed control panels, raise the backrest angle to above
30 as indicated on the weigh panel display. Verify that the >30
indicator is lit on the Air Mattress Control unit.
5. Raise all of the side rails. Put the head right side rail into the lowered
position and verify that the appropriate side rail down indicator
is lit on the Air Mattress Control unit. Raise the side rail. Repeat
this procedure for the other three side rails. Lower backrest to
approximately 15 .
6. Press the patient turn right button. Wait a few seconds to verify the
mattress has begun to turn. Put one of the right side rails into the
lowered position and verify that the alarm is heard and the mattress
starts to return to a level position. Verify the side rail down and alarm
indicators are both lit and the nurse turn right indicator is blinking.
Press the alarm silence button to acknowledge and clear the alarm.
7. Press and hold the CPR button on the attendant control panel. Verify
unit turns off.
8. Press the power button on the Air Mattress Control Unit and allow the
9. Raise backrest to approximately 15 , pull CPR handle on the side
Mattress Control unit turns off.
Содержание Citadel Patient Therapy System C100
Страница 1: ...Citadel Patient Therapy System Instructions for Use with people in mind 830 238 Rev F 201 ...
Страница 44: ...Intentionally left blank ...
Страница 45: ...Intentionally left blank ...
Страница 46: ...Intentionally left blank ...