12
2.5 Cooling
2.5.1 Cooling with ventilator (optional)
7KHLWHPVFDQEHFRROHGE\XVLQJ¿OWHUHGFRROLQJDLUE\DIDQ
sucking the warm air out from the chamber.
2.5.2 Internal cooling (optional)
Internal cooling takes water from the tank and the standard water
supply.
This method is not recommended according to EN ISO 15883.
2.6 Inspection
hole
The inspection hole is located in the front right corner of the
chamber.
Take off the front cover and remove the technical unit using a Torx
T10 screwdriver to access the inspection area.
1
001405
Figure 3. Inspection hole (1)
2.7 The
programs
Main program:
P1 Economy program for lightly soiled goods
P2 Normal program for normally soiled goods
Intensive program:
The intensive program has a number of
different cleaning phases depending on how soiled the goods are.
P3 Intensive program 1
P4 Intensive program 2