
24
1X-X3 Operation Manual
Testing fire routing
Note:
Before performing any fire routing tests, ensure that the fire routing signals
are not connected or notify the fire brigade of the tests.
To test fire routing, press the General Test button, and then press the Fire
Routing Start button.
The test is indicated as follows:
• A steady General Test LED
• A steady yellow Fire Routing On LED
• A flashing Fire Routing On LED and the test signal (3 seconds on, 5 seconds
off) without any configured delay for the duration of the test
To end the test, press the General Test button, and then press the Fire Routing
On button again.
If there is an extinguishing preactivation, activation, release, or fire alarm event
during the test, the control panel exits the test and responds to the alarm event
as configured.
Disabling or enabling a zone
To disable a zone, press the General Disable button, and then press the
corresponding Zone button.
The disablement is indicated as follows:
• A steady General Disable LED
• A steady yellow Zone LED
To enable the zone, press the General Disable button, and then press the Zone
button again.
Note:
No fire alarm or faults are indicated for disabled zones.
Содержание 1X-X3
Страница 1: ...1X X3 Operation Manual P N 501 419003 2 20 ISS 19JUL21 ...
Страница 6: ...iv 1X X3 Operation Manual ...
Страница 37: ......
Страница 38: ......