![Arista CloudVision DCA-CV-100 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/arista/cloudvision-dca-cv-100/cloudvision-dca-cv-100_quick-start-manual_2970745025.webp)
Appendix B
Rack Installation
Each appliance provides an accessory kit that contains parts that are required to install the appliance.
The following sections list the installation parts provided by the accessory kit.
•
.
•
B.1
Four-post Rack Installation
Use the following steps to assemble the racking rails and attaching the components to the system.
1. Identifying the Rail Kit contents.
Locate the components for installing the rail kit assembly:
•
Two sliding rail assemblies (1).
•
Two hook and loop straps (2).
2. Installing and Removing Tool-less Rails (Square Hole or Round Hole Racks).
a. Position the left and right rail end pieces labeled FRONT facing inward and orient each end
piece to seat in the holes on the front side of the vertical rack flanges (1).
b. Align each end piece in the bottom and top holes of the desired U spaces (2).
c. Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks
into place. Repeat these steps to position and seat the front end piece on the vertical rack flange
(3).
d. To remove the rails, pull the latch release button on the end piece midpoint and unseat each rail
(4).
21
Содержание CloudVision DCA-CV-100
Страница 1: ...CloudVision Appliance DCA CV 100 Quick Start Guide Arista Networks www arista com DOC 01796 08 ...
Страница 18: ...14 ...
Страница 23: ...Status Indicators Flashing amber Indicates a problem with the power supply 19 ...
Страница 24: ...20 ...
Страница 29: ...Rack Installation 25 ...
Страница 30: ...26 ...
Страница 40: ...36 ...
Страница 42: ...38 ...
Страница 44: ...Figure 19 Worksheet 40 ...
Страница 46: ...For the Taiwan BSMI RoHS Table go to https www arista com assets data pdf AristaBSMIRoHS pdf 42 ...