
7. Routing the Cables.
a. Locate the outer brackets on the interior sides of both rack flanges (1).
b. Bundle the cables gently, pulling them clear of the system connectors to the left and right sides
(2).
c. Thread the hook and loop straps through the tooled slots on the outer brackets on each side of
the system to secure the cable bundles (3).
B.2
Two-Post Rack Mount Parts
Two-Post Rack mount kit includes:
•
Two sliding rail assemblies.
•
Two hook and loop straps.
24
Содержание CloudVision DCA-CV-100
Страница 1: ...CloudVision Appliance DCA CV 100 Quick Start Guide Arista Networks www arista com DOC 01796 08 ...
Страница 18: ...14 ...
Страница 23: ...Status Indicators Flashing amber Indicates a problem with the power supply 19 ...
Страница 24: ...20 ...
Страница 29: ...Rack Installation 25 ...
Страница 30: ...26 ...
Страница 40: ...36 ...
Страница 42: ...38 ...
Страница 44: ...Figure 19 Worksheet 40 ...
Страница 46: ...For the Taiwan BSMI RoHS Table go to https www arista com assets data pdf AristaBSMIRoHS pdf 42 ...